Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
₹5.5 L
EMD Value
₹14,000
Closing Date
20 Jul 2026, 3:00 pmClosed
SA ASI Hampi Circle
The Superintending Archaeologist, Archaeological Survey of India, Hampi Circle, ANANTH, Door No.203, 1st B cross,30th Ward, Gokul Nagar, Hosapete
MC and EW (CAM) to Gulbarga Fort and Great Mosque in the Fort (Hathi Gate) at Kalaburagi
2026_ASI_916938_1
D-42/474/2022-Hampi Circle
Limited
Civil Works
Works
60 days
Gulbarga Fort
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,000
Yes
17 Sept 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Heading 1 | |||||
| 1.01 | Carefully dismantling the out of plumb disturbed portion of wall near the entrance way of Hati Gate without causing any damage to the nearby structures, including stacking of the useable materials for reuse and disposing of the waste materials away from the monument premises. | 3.89 | Cum | - | - |
| 1.02 | Removal of debris and stacking the useful materials for re-use and disposing the debris/garbage away from the site including lifting, carrying, loading,
unloading, transportation and spreading, etc complete all as per the directions and specifications of the site-in-charge. | 22.26 | Cum | - | - |
| 1.03 | Earthwork excavation for the foundation of the fortification wall in hard soil including breaking, clods, watering, ramming and sectioning of spoil bank, including stacking the useful materials
and disposing away the unwanted earth away from the site, etc. complete all as per the specifications and directions of site-in charge | 1.72 | Cum | - | - |
| 1.04 | Providing and laying lime Concrete for foundation in 1:2 :4 (1 part of Lime: 2 Part of Sand: 4 part of Aggregate) using 20mm trap stone/ granite aggregate including ramming, consolidating and
levelling etc complete all as per the directions and specifications of site in charge. | 6.15 | Cum | - | - |
| 1.05 | Restoration of the wall using 80% of available dismantled tarp stone and 20% new trap stones of average size 0.25 to 0.45 X 0.25-0.30 X 0.12 -0.15 in 1:2 Lime mortar matching the existing wall including cost of materials, labour, dressing, cutting, lifting, carrying, curing etc complete all as per the directions and specifications of site-in-charge. | 31.29 | Cum | - | - |
| 1.06 | Providing backfill/ core filling with RR masonry in 1:2 Lime Mortar with trap stone of average thickness of about 15cms, using 80% available stone at site and 20% new RR stones, matching the existing wall including cost of materials, labour, cutting, lifting, carrying, curing etc complete all as per the directions and specifications of site-in-charge. | 4.75 | Cum | - | - |
| 1.07 | Providing Steel barricade to regulate the parking and entry of vehicle inside fort from Hati Gate entrance using MS tube 139.70 X 4mm placed at 0.45m C/c fixed in lime concrete with fasteners etc complete as per the direction of the site in charge | 241.02 | Kg | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_963621.xls
BOQ • 0.29 MB
NITforHathiGate.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .