| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | L1 | Accepted-AOC Out of Two tenders recvied, The lowest Rate Quoted by M/S Sanganithi, Construction,Puthur at 0.08 Less Estimate may be approved. | |
| 2 | L2₹15.7 L+₹47,410.57 (3.11%)Rejected-Finance | L2 | Rejected-Finance The Above Rate Quoted |
| Sl No | Description | Qty | Unit | S.NATARAJAN L2 | SANGANITHI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Niraimathi Union road (Km 0/0-0/560) in Onpathuveli Panchayat | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0-0/480 | 432 | Sq.m | 6.3 ₹2,721.6 Lowest | 6.3 ₹2,721.6 Lowest |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | Km 0/0-0/480 | 172.8 | Cu.m | 150 ₹25,920 | 140.4 ₹24,261.12 Lowest |
| 6.00Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete. | |||||
| 7.00 | Km 0/0-0/480 | 486.67 | Sq.m | 30 ₹14,600.1 | 23.3 ₹11,339.41 Lowest |
| 8.00Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER | |||||
| 9.00 | Km 0/0-0/480 | 109.5 | Cu.m | 4,100 ₹4,48,950 | 3,906 ₹4,27,707 Lowest |
| 10.00Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges | |||||
Tender Value
₹15.4 L
EMD Value
₹15,500
Closing Date
4 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (B.PT)
Panchayat Union office , Ammapettai
Strengthening of Niraimathi Union road (Km 0/0-0/560) in Onpathuveli Panchayat at Ammapettai Block
2026_RDTN_666596_1
3410/2025/A2 Date.23.02.2026
Open Tender
Civil Works - Roads
Item Rate
Panchayat Union office, Ammapettai.
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹15,500
15 May 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of Niraimathi Union road (Km 0/0-0/560) in Onpathuveli Panchayat | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | - | - | - | - |
| 3 | Km 0/0-0/480 | 432 | Sq.m | - | - |
| 4 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | - | - | - | - |
| 5 | Km 0/0-0/480 | 172.8 | Cu.m | - | - |
| 6 | Picking the existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete. | - | - | - | - |
| 7 | Km 0/0-0/480 | 486.67 | Sq.m | - | - |
| 8 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER | - | - | - | - |
| 9 | Km 0/0-0/480 | 109.5 | Cu.m | - | - |
| 10 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
TechnicalBitniraimathi.pdf
Tender Documents • 0.93 MB
PriceBitniraimathi.pdf
Tender Documents • 0.60 MB
BOQ_800734.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .