Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹70.1 L+₹71,084.52 (1.03%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C.K.CONSTRUCTIONS L1 | K.VENKATACHALAM L2 |
|---|---|---|---|---|---|
| 1.00(I). BT Road | |||||
| 1.10 | Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers | 9,668 | m3 | 87 ₹8,41,116 Lowest | 90 ₹8,70,120 |
| 1.20 | Advance Patch work 13.20mm Providing Advance Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bitumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat separately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 36.02 | m3 | 3,974 ₹1,43,143.48 Lowest | 4,000 ₹1,44,080 |
| 1.30 | Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications | 9,668 | m3 | 25 ₹2,41,700 Lowest | 27 ₹2,61,036 |
| 1.40 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 290.5 | m3 | 10,359 ₹30,09,289.5 Lowest | 10,400 ₹30,21,200 |
| 1.50 | Painting center line, edge line road marking 100 width with Thermoplastic Paint (hot application) in such way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00 m curved portion and in straight portion painting length will be 3.00m with a gap of 3.00m curved for centerline by indigenous hand propelled road marking machine with single coat including cost of all materials such as pigments, extender, fine aggregate stand oil (Binder) glass beads as per 3262:1976 for the preparation of thermoplastic paint at site mixing glass beeds 10% by wieght of the ingredient at the time of preparation of paint and 10% glass beads but wt. at the time of application of paint on the road surface, including cost of all etc., complete | 321.5 | m3 | 839 ₹2,69,738.5 Lowest | 850 ₹2,73,275 |
| 1.60(II). CC Road | |||||
| 1.70 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges such as Earth work and remove the same 2Km away from the site etc, complete as per standard specifications. | 345 | m2 | 118 ₹40,710 Lowest | 120 ₹41,400 |
| 1.80 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 172.5 | m2 | 4,993 ₹8,61,292.5 Lowest | 5,004 ₹8,63,190 |
| 1.90 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | 98.5 | m2 | 280 ₹27,580 Lowest | 290 ₹28,565 |
Tender Value
₹83.1 L
EMD Value
₹83,100
Closing Date
27 Apr 2023, 1:00 pmClosed
THE COMMISSIONER
Salem City Muncipal Corporation, Fort Main Road, Salem
15th CFC 2022-2023 Restoration of BT Road at Suramangalam Ward Office
2023_MAWS_301537_1
E4-Est No 280-R-2022-2023
Open Tender
Civil Works
Lump-sum
180 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹83,100
Yes
12 Oct 2026
12 Apr 2023
28 Apr 2023
13 Apr 2023
27 Apr 2023
13 Apr 2023
Amount
(I). BT Road
Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers
Advance Patch work 13.20mm Providing Advance Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bitumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat separately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Painting center line, edge line road marking 100 width with Thermoplastic Paint (hot application) in such way that painting length will be 3.00m with a gap of 3.00m with a gap of 3.00 m curved portion and in straight portion painting length will be 3.00m with a gap of 3.00m curved for centerline by indigenous hand propelled road marking machine with single coat including cost of all materials such as pigments, extender, fine aggregate stand oil (Binder) glass beads as per 3262:1976 for the preparation of thermoplastic paint at site mixing glass beeds 10% by wieght of the ingredient at the time of preparation of paint and 10% glass beads but wt. at the time of application of paint on the road surface, including cost of all etc., complete
(II). CC Road
Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply Pipes. The Rate inclusive of all charges such as Earth work and remove the same 2Km away from the site etc, complete as per standard specifications.
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over(silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
K.VENKATACHALAM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .