| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹45.3 L+₹42,352.10 (0.94%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹49.0 L+₹4.1 L (9.09%)Rejected-Finance LEKSHMI NIVAS TELANG ROAD NANDANGADDA KARWAR 581 304 | KARWAR | UTTARA KANNADA | KARNATAKA | 581304 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹49.3 L+₹4.4 L (9.91%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹54.2 L+₹9.3 L (20.7%)Rejected-Finance | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | KVL CONSTRUCTION L2 | LEKSHMI ENGINEERS L3 | ABDUL RAHIM L5 | K.G.SHANKER L4 | M/S KAMALKANTH NAIK L6 | H S KRISHNA ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing n exc 15 cm deep in Soft/loose soil for hard standing Stage all as specified and directed. | 22 | Sqm | 15 ₹330 Lowest | 42 ₹924 | 40 ₹880 | 35 ₹770 | 100 ₹2,200 | 45 ₹990 |
| 2.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth in Soft and Loose Soil for foundation, etc. or shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and directed. | 195.44 | Cum | 300 ₹58,632 | 310 ₹60,586.4 | 400 ₹78,176 | 280 ₹54,723.2 Lowest | 300 ₹58,632 | 355 ₹69,381.2 |
| 3.00 | Returning, filling in soil including spreading, levelling, watering and well ramming in layers n.exc. 25cm all as specified & directed. | 170.79 | Cum | 40 ₹6,831.6 Lowest | 60 ₹10,247.4 | 80 ₹13,663.2 | 70 ₹11,955.3 | 150 ₹25,618.5 | 155 ₹26,472.45 |
| 4.00 | Removing surplus soil to a distance n exc 50m and making good surface at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 46.84 | Cum | 80 ₹3,747.2 Lowest | 110 ₹5,152.4 | 150 ₹7,026 | 100 ₹4,684 | 200 ₹9,368 | 325 ₹15,223 |
| 5.00 | M&L for hardcore of broken boulders of gauge n.exc 63 mm, deposited, spread and levelled in layers n.exc 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | 3.1 | Cum | 2,000 ₹6,200 | 1,600 ₹4,960 | 2,000 ₹6,200 | 1,500 ₹4,650 Lowest | 3,000 ₹9,300 | 2,200 ₹6,820 |
| 6.00 | M&L for RCC design mix M-30 using 20 mm graded stone aggregate for foundation including raft footing Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, basement slabs, under-reamed piles and mass concrete etc., complete all as specified and directed. | 5.76 | Cum | 9,500 ₹54,720 | 9,700 ₹55,872 | 10,000 ₹57,600 | 9,000 ₹51,840 | 8,000 ₹46,080 | 7,650 ₹44,064 Lowest |
| 7.00 | M&L for RCC design mix M-30 using 20 mm graded stone aggregate for column, pillars, piers, post and struts etc., complete all as specified and directed. | 3.36 | Cum | 9,500 ₹31,920 | 9,700 ₹32,592 | 10,000 ₹33,600 | 9,000 ₹30,240 | 8,000 ₹26,880 Lowest | 8,500 ₹28,560 |
| 8.00 | M&L for formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter on Flat rough finished surfaces of concrete. | 7.2 | Sqm | 350 ₹2,520 | 425 ₹3,060 | 500 ₹3,600 | 300 ₹2,160 | 700 ₹5,040 | 295 ₹2,124 Lowest |
| 9.00 | M&L for formwork for Flat fair surfaces of finished concrete to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including sup- ports, overhangs, also splays between floors and beams, etc. complete all as specified and directed. | 20 | Sqm | 350 ₹7,000 | 475 ₹9,500 | 500 ₹10,000 | 300 ₹6,000 Lowest | 700 ₹14,000 | 605 ₹12,100 |
| 10.00 | M&L for formwork to sides of pillars, posts, struts, piers, columns and stanchions on square, rectangular or polygonal rough finished surfaces of concrete | 33.6 | Sqm | 350 ₹11,760 | 475 ₹15,960 | 400 ₹13,440 | 310 ₹10,416 Lowest | 700 ₹23,520 | 600 ₹20,160 |
Tender Value
₹49.4 L
EMD Value
₹98,800
Closing Date
16 Apr 2026, 6:00 pmClosed
GE (SB) KARWAR
GARRISON ENGINEER (SEABIRD) KARWAR Naval Base, Sankrubagh (PO) Karwar - 581308
SPECIAL REPAIRS BR FOR C3 STORE HOUSE OF MO KAR, ADDISTION ALTERATION TO EXISTING TOILET BATHROOM INCLUDING SANITARY FITTING ADJACENT TO BUILDING NO. T-4 CDT KAR, AND PROVISION OF PARKING SHED NEAR DSS-04 AT MO KAR AT NAVAL BASE KARWAR
2026_MES_753198_2
8461/E8
Open Tender
Civil Works
Item Rate
180 days
GE (SB) KARWAR
AS PER NIT
8 documents required · 8 mandatory
₹500
Yes
GE (SB) KARWAR
₹98,800
Yes
26 May 2026
2 Apr 2026
18 Apr 2026
2 Apr 2026
16 Apr 2026
9 Apr 2026
2 Apr 2026 - 8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Surface dressing n exc 15 cm deep in Soft/loose soil for hard standing Stage all as specified and directed. | - | Sqm | - | - |
| - | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth in Soft and Loose Soil for foundation, etc. or shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out complete all as specified and directed. | 1 | Cum | - | - |
| - | Returning, filling in soil including spreading, levelling, watering and well ramming in layers n.exc. 25cm all as specified & directed. | 1 | Cum | - | - |
| - | Removing surplus soil to a distance n exc 50m and making good surface at a level n exc. 1.5 m above the starting point complete all as specified and directed. | - | Cum | - | - |
| - | M&L for hardcore of broken boulders of gauge n.exc 63 mm, deposited, spread and levelled in layers n.exc 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | - | Cum | - | - |
| - | M&L for RCC design mix M-30 using 20 mm graded stone aggregate for foundation including raft footing Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, basement slabs, under-reamed piles and mass concrete etc., complete all as specified and directed. | 1 | Cum | - | - |
| - | M&L for RCC design mix M-30 using 20 mm graded stone aggregate for column, pillars, piers, post and struts etc., complete all as specified and directed. | 1 | Cum | - | - |
| - | M&L for formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter on Flat rough finished surfaces of concrete. | - | Sqm | - | - |
| - | M&L for formwork for Flat fair surfaces of finished concrete to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including sup- ports, overhangs, also splays between floors and beams, etc. complete all as specified and directed. | - | Sqm | - | - |
| - | M&L for formwork to sides of pillars, posts, struts, piers, columns and stanchions on square, rectangular or polygonal rough finished surfaces of concrete | - | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender8461.pdf
Tender Documents • 1.23 MB
BOQ_849255.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .