| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.1 LAccepted-AOC | 1 | Accepted-AOC l1 | |
| 2 | 2₹19.2 L+₹12,644.20 (0.66%)Rejected-AOC | 2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | R. Marimuthu L1 | LK Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc., complete. | 32 | hrs | 908.63 ₹29,076.16 Lowest | 911.03 ₹29,152.96 |
| 2.00 | Dismantling of Existing RCC Manhole Slab and Manhole Ring and side wall wherever necessary using hand drilling Concrete breaker machine and deployinh mazdoor for drilling works etc., complete as directed by departmental officers | 42 | nos | 4,308.1 ₹1,80,940.2 Lowest | 4,310.5 ₹1,81,041 |
| 3.00 | P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by site Engineer. From 0m to 1.5 m | 7.56 | m3 | 5,104.1 ₹38,587 Lowest | 5,106.5 ₹38,605.14 |
| 4.00 | Reinforced cement concrete M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by by site Engineer. Below GL | 52.5 | m3 | 8,643 ₹4,53,757.5 Lowest | 8,645.4 ₹4,53,883.5 |
| 5.00 | Providing, in position TMT Fe-500 Steel Reinforcement with epoxy coating in all RCC Work at all levels & heights, including Supplying, cutting, bending, tying and fixing in position steel (laps, hooks and wastage shall not be measured and paid) for reinforced cement concrete works including cost of materials, cost of steel, labour, HOM of machinery, cost of binding wire and cover for the reinforcements etc., complete as per specification and as directed by the Engineer in charge. upto 16mm dia. | 3,780 | KG | 89.28 ₹3,37,478.4 Lowest | 91.68 ₹3,46,550.4 |
| 6.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm spaced at 90cm c/c and supported by Casuarina Props 10cm - 13cm spaced at 75cm c/c etc., complete and as directed by by site Engineer.(Retrieved Materials should be taken back by the contractor.) Plane surface From 0m to 3.3 m | 15 | m2 | 493.4 ₹7,401 Lowest | 495.8 ₹7,437 |
| 6.01 | Curved surface From 0 m to 3.3 m | 137 | m2 | 1,533.9 ₹2,10,144.3 Lowest | 1,536.3 ₹2,10,473.1 |
| 7.00 | Refilling the outside of the well with excavated earth (other then sand) complying with standard specification for filling the foundation including watering consolidation etc., complete as directed by by site Engineer. | 79 | m3 | 37.02 ₹2,924.58 Lowest | 39.42 ₹3,114.18 |
| 8.00 | Disposal of surplus excavated earth in pipe laying and road restoration works etc.,transporting to the sites specified by Engineer within 5 Km lead, including loading, spreading etc., complete and as directed by the Engineer. Including dismantling | 42 | No | 1,199.4 ₹50,374.8 Lowest | 1,201.8 ₹50,475.6 |
| 9.00 | Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 151.7 | sqm | 308.55 ₹46,807.04 Lowest | 310.95 ₹47,171.12 |
Tender Value
₹19.7 L
EMD Value
₹19,700
Closing Date
10 Mar 2025, 3:00 pmClosed
Commissioner
Tiruvannamalai City Municipal Corporation
Dismantling and Reconstruction of RCC Manhole (42 Nos) , Supply and Delivery of (FRC) Manhole Cover and Frame at Thiruvoodal Street and Theradi street (madaveethi CC Road Project) in Tiruvannamalai City Municipal Corporation.
2025_MAWS_530659_2
4023/2024/E2
Open Tender
Civil Works
Works
45 days
Tiruvannamalai City Municipal Corporation
Places Refer Tender Notices
2 documents required · 2 mandatory
₹0
₹19,700
Yes
16 Oct 2025
7 Mar 2025
10 Mar 2025
7 Mar 2025
10 Mar 2025
7 Mar 2025
Amount
Hire charges for deploying earth moving machinery JCB for earthwork including diesel, oil and labour charges etc., complete.
Dismantling of Existing RCC Manhole Slab and Manhole Ring and side wall wherever necessary using hand drilling Concrete breaker machine and deployinh mazdoor for drilling works etc., complete as directed by departmental officers
P.C.C 1:4:8 (one cement, four sand and eight coarse aggregate) using S.R. cement and 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by site Engineer. From 0m to 1.5 m
Reinforced cement concrete M30 using S.R. cement and 20mm size hard blue granite stone (machine crushed) excluding cost of reinforcement, fabrication and placing the grills in position and excluding cost of shoring and strutting but including curing, finishing and mixing concrete using mechanical mixer machine and compaction by machanical vibrator etc., complete and as directed by by site Engineer. Below GL
Providing, in position TMT Fe-500 Steel Reinforcement with epoxy coating in all RCC Work at all levels & heights, including Supplying, cutting, bending, tying and fixing in position steel (laps, hooks and wastage shall not be measured and paid) for reinforced cement concrete works including cost of materials, cost of steel, labour, HOM of machinery, cost of binding wire and cover for the reinforcements etc., complete as per specification and as directed by the Engineer in charge. upto 16mm dia.
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm spaced at 90cm c/c and supported by Casuarina Props 10cm - 13cm spaced at 75cm c/c etc., complete and as directed by by site Engineer.(Retrieved Materials should be taken back by the contractor.) Plane surface From 0m to 3.3 m
Curved surface From 0 m to 3.3 m
Refilling the outside of the well with excavated earth (other then sand) complying with standard specification for filling the foundation including watering consolidation etc., complete as directed by by site Engineer.
Disposal of surplus excavated earth in pipe laying and road restoration works etc.,transporting to the sites specified by Engineer within 5 Km lead, including loading, spreading etc., complete and as directed by the Engineer. Including dismantling
Plastering with cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Supply and Delivery of Fiber Reinforced Concrete Frame(FRC) Manhole Covers to stores on as per IS 12592:2002 to its latest revision with reinforcement details for covers 600mm dia FRC manhole cover to suit 600 mm clear opening manhole frame including cost and conveyance of all materials etc., complete as per standard specification
Supply and Delivery of FRC Manhole Frames to stores on as per IS 12592:2002 to its latest revision with reinforcement details for frames600mm dia FRC manhole frame to have clear opening of 600mm dia to suit 600mm dia FRC Cover including cost and conveyance of all materials etc., complete as per standard specification
Providing Manhole Raising work including Removing of M40 Grade concrete due to level increased as per site requirement by Highways department .Works includes with use of Drilling Machine and laying of M40 Grade Concrete and Inner Plastering as instructed by Departmental Officers.
Add GST 18%
LK Constructions (BID ID -1266556)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_631746.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .