| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.2 CrAccepted-AOC 26 10 627 759 | TENKASI | TAMIL NADU | 627759 | 1 | Accepted-AOC COT accepted | |
| 2 | 2₹25.9 Cr+₹95.5 L (3.83%)Rejected-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | 2 | Rejected-Finance L2 Tenderer | |
| 3 | 3₹26.4 Cr+₹1.5 Cr (5.83%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | 3 | Rejected-Finance L3 Tenderer |
Tender Value
₹24.2 Cr
EMD Value
₹12.2 L
Closing Date
15 Oct 2025, 11:00 amClosed
Thiru.R.K.Ramesh
O/o the Superintending Engineer Highways Projects Circle, Alagarkovil main road, Madurai - 2
Formation of Alternative Route for Thoothukudi Tiruchendur Kanniyakumari road at km 0/0 -1/2 including Construction of High Level Bridge at km0/4 across Karumeni River
2025_HWAY_609837_3
TN No 7 2025 26 SDO Dated 19.08.2025
Open Tender
Civil Works - Highways
Percentage
455 days
Madhavankurichi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12.2 L
20 Nov 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
29 Sept 2025 - 13 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land - Heavy Jungle including uprooting wild vegetation, grass, bushes, shurbs, sapling and trees of girth upto 300mm, removable of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 100m including removable and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201. for Main work | 32,400 | Sqm | 9.18 | ₹2,97,432 |
| 2 | Excavation including removal of sandy soil and satisfactory disposal of all materials necessary for the construction of road way &side drains in accordance with Specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per SS20B. for Box Cutting MOR&TH No. 111, 112, 202,301,302, 303,305, 900 - CUTTING QUANTITY For Main work & Junction Improvements | 17,623 | Cum | 249.79 | ₹44,02,049.17 |
| 3 | Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per Clause 305 of MoRT&H - V Revision For Main work and Junction Improvements | 33,372 | Cum | 647 | ₹2,15,91,684 |
| 4 | Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per Clause 305 MoRT&H - V Revision for Main work and Junction Improvements | 12,662 | Cum | 659 | ₹83,44,258 |
| 5 | Providing and laying Granular Sub-Base Grade - V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per Clause 111, 112, 401, 900.MoRT&H - V Revision for Main work, Junction Improvements and Well | 3,246 | Cum | 2,112.77 | ₹68,58,051.42 |
| 6 | Providing and laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per Clause 111, 112, 401, 900.MoRT&H - V Revision for Main work and Junction Improvements | 2,029 | Cum | 2,385.81 | ₹48,40,808.49 |
| 7 | Provding and laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per Clause 111, 112, 406, 900 of MoRT&H - V Revision for Main work and Junction Improvements | 3,912 | Cum | 2,542.52 | ₹99,46,338.24 |
| 8 | Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg/sqm using bitumen sprayer as directed by the Engineer - over WMM as per Clause No. 111, 112, 502.of MoRT&H - V Revision for Main work andJunction Improvements | 15,144 | Sqm | 87.2 | ₹13,20,556.8 |
| 9 | Providing and applying Tack Coat over Granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per Clause No.111,112,503,900 of MoRT&H - V Revision for Main work andJunction Improvements | 15,144 | Sqm | 20.25 | ₹3,06,666 |
| 10 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the concrete surface cleaned with mechanical broom as directed by the Engineer as per Clause No.111,112,503,900.of MoRT&H - V Revision for Main work andJunction Improvements | 126 | Sqm | 22.9 | ₹2,885.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TenderDocumentISRO0to1.pdf
Tender Documents • 0.74 MB
BOQ_728715.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .