Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 CrAccepted-AOC BFH 20 SHALIMAR BAGH DELHI 110088 | DELHI | NORTH WEST DELHI | DELHI | 110088 | L-1 | Accepted-AOC Lowest Bidder | |
| 2 | L-2₹24.0 L+₹1.7 L (7.51%)Rejected-AOC VPO SARNA STATION PATHANKOT 145 025 PB | PATHANKOT | PUNJAB | 145025 | L-2 | Rejected-AOC Otherthan Lowest Bidder | |
| 3 | L-3₹26.0 L+₹3.8 L (16.8%)Rejected-AOC NEAR TRUCK UNION ADAMPUR DOABA 144102 | ADAMPUR | JALANDHAR | PUNJAB | 144102 | L-3 | Rejected-AOC Otherthan Lowest Bidder | |
| 4 | L-4₹31.5 L+₹9.2 L (41.5%)Rejected-AOC | L-4 | Rejected-AOC Otherthan Lowest Bidder |
Tender Value
₹33 L
EMD Value
₹66,000
Closing Date
27 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE(AF) Chandigarh
HQ CWE(AF) Chandigarh - 160003
REPAIR TO PU JOINT FILLING WORKS OF RIGID PAVEMENTS IN TECHNICAL AREA AT AIR FORCE STATION ADAMPUR
2020_MES_365442_1
CWE/AF CHD/ADM/T-18/2020-2021
Open Tender
Civil Works
Item Rate
180 days
Adampur
As per NIT
8 documents required · 8 mandatory
₹500
GE(AF) Adampur
₹66,000
Yes
4 Sept 2020
30 Jul 2020
31 Aug 2020
30 Jul 2020
27 Aug 2020
13 Aug 2020
60 days
Amount
Raking out of expansion joints of rigid pavement 20mm to 25mm wide upto full depth of slabs (approx 300mm) and removing existing sealing compound/PU at location directed by Engineer-in-Charge including existing backup rod and filler board, then rubbing/clearing the side of the joints with concrete cutter, wire/coir brushes and then with compressed air by compressors so that side of the joints shall be completely free of any sticked materials of existing sealing compound upto the total depth of raked out joints and filling the joints with 25mm thick expanded polyurethane foam filler board 250mm wide (Armour Board), 30mm dia expanded polyurethane foam closed cell back up rod and sealed with polyurethane sealant (minimum depth of sealant 12mm) using mechanical means with performance guarantee of ten years and minimum movement accommodation factor (MAF)+30% conforming to the requirements of BS: 5212 and EN-141875-2003 for Hydrolysis water resistance test including two coats of primer all as per manufacturer instruction including provision of masking tape on edges of joints to prevent accidental spillage of sealant on top surface, complete all as specified and as directed by Engineer-in-Charge. Notes:- (i) raked out materials shall be removed to location at a distance exc 5Km from the starting point as directed by Engineer-in-charge. (ii) To maintain proper record of PERFORMANCE GUARANTEE for three years, each slab/panel of joint filling shall be numbered with two to five stenciled letters with indigo paint. (Note: A minimum gap of 3mm between the top edges joint and top of PU/sealing compound shall be maintained)
Raking out joints 08 to 15mm wide and removing existing sealing compound/PU, backup rod, filler board and all loose & foreign material from the Contraction (Dummy) joints of existing concrete pavements upto 100mm deep and rubbing/cleaning the sides of joint with concrete cutter, wire/coir brushes in cleaning the surfaces with compressed air by using compressors and filling the joint with expanded polyurethane foam filler board 75mm wide (Armour Board), 10mm dia backup rod and sealed with polyurethane sealant (minimum depth of sealant 12mm) using mechanical means, complying with performance guarantee of 10 years and minimum Movement Accommodation Factor (MAF) +30% conforming to the requirement of BS:5212 and EN-141875-2003 for Hydrolysis/water resistance test as per manufacturers instructions, 2 coats priming the sides, applying masking tape on edges of joints to prevent accident spillage of sealant on top surface and to give a neat finish to the sealant and removing the masking tape after the sealant is applied, complete all as specified and as directed by Engineer-in-Charge. Notes:- (i) Raked out materials shall be removed to location at a distance exc 5Km from the starting point as directed by Engineer-in-charge. (ii) To maintain proper record of PERFORMANCE GUARANTEE for three years, each slab/panel of joint filling shall be numbered with two to five stenciled letters with indigo paint.
Raking out joints 08 to 15mm wide and removing existing sealing compound/PU and backup rod including all loose & foreign material from the Construction joints of existing concrete pavements upto the depth of 30mm and rubbing/cleaning the sides of joint with concrete cutter, wire/coir brushes in cleaning the surfaces with compressed air by using compressors and filling the joint with 10mm dia expanded polyurethane foam closed cell backup rod and sealed with polyurethane joint sealant compound (minimum depth of sealant 12mm) using mechanical means with performance guarantee of 10 years and minimum Movement Accommodation Factor (MAF) +30% conforming to the requirement of BS:5212 and EN-141875-2003 for Hydrolysis/water resistance test including two coats of primer, complete all as per manufacturers instruction, complete all as specified and as directed by Engineer-in-Charge.. Notes:- (i) Raked out materials shall be removed to location at a distance exc 5Km from the starting point as directed by Engineer-in-charge. (ii) To maintain proper record of PERFORMANCE GUARANTEE for three years, each slab/panel of joint filling shall be numbered with two to five stenciled letters with indigo paint. Further Notes for item No. 1 to 3:- (i) A sum equal to 5% amount of above items (as executed) shall be kept reserved for 10 years guarantee period in addition to a written guarantee on Non Judicial stamp paper to be submitted by contractor after completion of work. (ii) The measurements of these items shall be duly preserved in MB, RPMB and the complete details such as Pavement number of the concrete pavements for which these items have been executed shall be recorded and submitted by JE, AGE and GE on relief. (iii) In addition, all the above details shall be intimated in writing to the Station Authorities after completion of work.
SUBASH MAHAJAN
MALHOTRA AND ASSOCIATES
Sethi Builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .