| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | ₹2.1 L | L1 | Accepted-Finance TC recommendation |
| 2 | L2₹2.2 LRejected-Finance SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | ₹2.2 L | L2 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | GT ENTERPRISE L1 | UNITED ENGINEERING ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Job discription | |||||
| 2.00 | Water side of the boiler was covered with thick scale and cleaning. | 1 | ls | 13,900 ₹13,900 | 14,000 ₹14,000 |
| 3.00 | Old bothe side fusible plug opening Boring, threading labour charges | 1 | ls | 3,600 ₹3,600 | 4,000 ₹4,000 |
| 4.00 | New fusible plug both side & same position fitting | 1 | ls | 15,900 ₹15,900 | 16,000 ₹16,000 |
| 5.00 | Boiler all valve mounting repairing. Overhauling & bo, iler inspector and Inspection, with consumable and labour charges | 1 | ls | 23,018 ₹23,018 | 24,000 ₹24,000 |
| 6.00 | Isolated fittings wire observed on water side of shell Str ke4 nos. X dia 2.5 mtrs X length 2.5 mtrs. To be built up by electric B.q. Arc welding process to be grinding smooth to original thickness with consumable and labourcharges | 1 | ls | 20,700 ₹20,700 | 21,000 ₹21,000 |
| 7.00 | Isolated.fittings were observed on water side Flue pipe both side 1(One) Flue pipe 10 nos. Pipes x 2 nos. (Both side) flue pipes 20 n<:ls. pipe 'flue pipe size dfa 1 mtrs. X Length 1mt. To bebJJilt up by electric B.W., Arc welding process and 1:0 be grinding smooth to original thickness with consumable and Labour charges | 1 | ls | 41,600 ₹41,600 | 42,500 ₹42,500 |
| 8.00 | Lancashire boiler hydraulic test arrangement Inspection Director-of Boiler. | 1 | ls | 15,300 ₹15,300 | 15,900 ₹15,900 |
| 9.00 | Lancashire Boiler fitting purchase materials tape joint, cotton tape, steam joint, holetight, nut, bolt, rubber joint, fiber bush, rubber concerete glass etc. | 1 | ls | 13,200 ₹13,200 | 13,400 ₹13,400 |
| 10.00 | Lancashire boiler fitting, commissioning steaming and running condition with consumable and labour charges | 1 | ls | 18,872 ₹18,872 | 19,200 ₹19,200 |
Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
24 Sept 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Overhauling of Lancashire boiler WBL-3074 at Shyamsundarpur Colliery
2025_ECL_343724_1
ECL/GM/BA/E TENDER/25-26/ENM/113 Dt 10.09.2025
Open Tender
Electrical and Maintenance Works
30 days
Shyamsundarpur Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,700
13 May 2026
10 Sept 2025
26 Sept 2025
10 Sept 2025
24 Sept 2025
10 Sept 2025
10 Sept 2025 - 13 Sept 2025
Amount
Job discription
Water side of the boiler was covered with thick scale and cleaning.
Old bothe side fusible plug opening Boring, threading labour charges
New fusible plug both side & same position fitting
Boiler all valve mounting repairing. Overhauling & bo, iler inspector and Inspection, with consumable and labour charges
Isolated fittings wire observed on water side of shell Str ke4 nos. X dia 2.5 mtrs X length 2.5 mtrs. To be built up by electric B.q. Arc welding process to be grinding smooth to original thickness with consumable and labourcharges
Isolated.fittings were observed on water side Flue pipe both side 1(One) Flue pipe 10 nos. Pipes x 2 nos. (Both side) flue pipes 20 n<:ls. pipe 'flue pipe size dfa 1 mtrs. X Length 1mt. To bebJJilt up by electric B.W., Arc welding process and 1:0 be grinding smooth to original thickness with consumable and Labour charges
Lancashire boiler hydraulic test arrangement Inspection Director-of Boiler.
Lancashire Boiler fitting purchase materials tape joint, cotton tape, steam joint, holetight, nut, bolt, rubber joint, fiber bush, rubber concerete glass etc.
Lancashire boiler fitting, commissioning steaming and running condition with consumable and labour charges
Inspection fees for dry and hydraulic test of the boiler
Total impact of GST for the purpose of CTC
UNITED ENGINEERING ENTERPRISE (BID ID -1184374)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.21 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_356302.xls
BOQ • 0.26 MB