Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 L+₹35,335.14 (11.5%)Admitted-Finance | ₹3.4 L+₹35,335.14 (11.5%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹61,610.72 (20.0%)Admitted-Finance | ₹3.7 L+₹61,610.72 (20.0%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Statutory requirements not fulfilled by the bidder |
| Sl No | Description | Qty | Unit | RS SS RAILING CITY L1 | EXCEL VALVES PIPELINES TESTING AND TREATMENT SERVICES L2 | SIGMAVIX INFRA INDIA PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Supply and Installation of Lantern house doors at Point calimere and Muttom Lighthouse stations under Chennai directorate | ||||||
| 1.10 | Supply of Lantern house Doors as per the Drawing and sample and specifications with prescribed material (Mild Steel Hot Dip Galvanized) Charges Inclusive all Template Making by sample, Loading, Unloading, Packing, forwarding charges, Freight Charges all the necessary arrangements upto Point Calimere and Muttom Point Lighthouses.(Lantern house door-1 No for Point Calimere Lighthouse and 1 No for Muttom Point Lighthouse) | 2 | Nos | 2,77,250.4 ₹2,77,250.4 | 2,74,688.9 ₹2,74,688.9 Lowest | 3,32,700 ₹3,32,700 |
| 1.20 | Dismantling of old Lantern house door and installation of new lantern house door at Point Calimere Lighthouse.Charges inclusive of Painting of Lantern house door,Assembly related fabrication charges, Lifting, shifting, Positioning, necessary tools and tackles and all the necessary arrangements such as Installation and operation of winch machine/Lifting equipment,skilled labour charges, Loading, Unloading, Packing, Freight Charges and supply and installation of temporary door (Wood/Plastic/other lightweight materials) until the newly fabricated door is fixed at Point Calimere Lighthouse | 1 | LS | 15,402.8 ₹15,402.8 Lowest | 34,366.12 ₹34,366.12 | 18,483.36 ₹18,483.36 |
| 1.30 | Dismantling of old Lantern house door and installation of new lantern house door at Muttom Point Lighthouse.Charges inclusive of Painting of Lantern house door,Assembly related fabrication charges, Lifting, shifting, Positioning, necessary tools and tackles and all the necessary arrangements such as Installation and operation of winch machine/Lifting equipment,skilled labour charges, Loading, Unloading, Packing, Freight Charges and supply and installation of temporary door (Wood/Plastic/other lightweight materials) until the newly fabricated door is fixed at Muttom Point Lighthouse. | 1 | LS | 15,402.8 ₹15,402.8 Lowest | 34,336.12 ₹34,336.12 | 18,483.36 ₹18,483.36 |
Tender Value
₹3.1 L
EMD Value
₹6,181
Closing Date
28 May 2026, 3:00 pmClosed
The Director
The Director,Directorate of Lighthouses and Lightships,Deep Bhavan office,5/20 Jaffer syrang street,Chennai-600001
Supply and Installation of Lantern house doors at Point Calimere and Muttom Point Lighthouse stations under chennai directorate.
2026_DGLL_908798_1
MDS-01002(12)/3/2020-MNT-MD
Open Tender
Job Works
Works
90 days
Pointcalimere and Muttom LHs
As per the tender document
2 documents required · 2 mandatory
₹0
₹6,181
Yes
Chennai
22 Jun 2026
15 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
15 May 2026 - 18 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply and Installation of Lantern house doors at Point calimere and Muttom Lighthouse stations under Chennai directorate | |||||
| 1.1 | Supply of Lantern house Doors as per the Drawing and sample and specifications with prescribed material (Mild Steel Hot Dip Galvanized) Charges Inclusive all Template Making by sample, Loading, Unloading, Packing, forwarding charges, Freight Charges all the necessary arrangements upto Point Calimere and Muttom Point Lighthouses.(Lantern house door-1 No for Point Calimere Lighthouse and 1 No for Muttom Point Lighthouse) | 2 | Nos | - | - |
| 1.2 | Dismantling of old Lantern house door and installation of new lantern house door at Point Calimere Lighthouse.Charges inclusive of Painting of Lantern house door,Assembly related fabrication charges, Lifting, shifting, Positioning, necessary tools and tackles and all the necessary arrangements such as Installation and operation of winch machine/Lifting equipment,skilled labour charges, Loading, Unloading, Packing, Freight Charges and supply and installation of temporary door (Wood/Plastic/other lightweight materials) until the newly fabricated door is fixed at Point Calimere Lighthouse | 1 | LS | - | - |
| 1.3 | Dismantling of old Lantern house door and installation of new lantern house door at Muttom Point Lighthouse.Charges inclusive of Painting of Lantern house door,Assembly related fabrication charges, Lifting, shifting, Positioning, necessary tools and tackles and all the necessary arrangements such as Installation and operation of winch machine/Lifting equipment,skilled labour charges, Loading, Unloading, Packing, Freight Charges and supply and installation of temporary door (Wood/Plastic/other lightweight materials) until the newly fabricated door is fixed at Muttom Point Lighthouse. | 1 | LS | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
PCMU.pdf
Tender Documents • 1.99 MB
BOQ_955173.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .