| Sl No | Description | Qty | Unit | Dillibabu L1 |
|---|---|---|---|---|
| 1.00 | Fabrication and supply of GI Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions. | 46 | MT | 1,50,000 ₹69,00,000 Lowest |
| 2.00 | Fabrication and supply of HT Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions. | 26 | MT | 1,50,000 ₹39,00,000 Lowest |
| 3.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 4 | MT | 1,50,000 ₹6,00,000 Lowest |
| 4.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Zebra Conductor) | 39 | Set | 4,500 ₹1,75,500 Lowest |
| 5.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Single suspension fittings for Zebra Conductor | 27 | Set | 3,000 ₹81,000 Lowest |
| 6.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Vibration dampers for Zebra Conductor | 39 | Set | 2,000 ₹78,000 Lowest |
| 7.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Mid span joint for Zebra | 6 | Set | 200 ₹1,200 Lowest |
| 8.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. Repair sleve for Zebra | 6 | Set | 50 ₹300 Lowest |
| 9.00 | Supply of hard ware’s for conductor as per IS conforming to latest issue. PA Rod for Zebra conductor | 27 | Set | 2,500 ₹67,500 Lowest |
| 10.00 | Labour charges for clearing of juliflora jungle for facilitating survey including cost of all labour, lead, lift etc., complete | 10,950 | Sq.M | 2 ₹21,900 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
2 Aug 2022, 2:30 pmClosed
CE/TP-I/CHN
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Conversion of existing 230/110KV DC lines into MC line for the extension of 230KV Supply to M/s.First Solar (Prospective consumer with demand of 52 MVA) at SIPCOT Industrial park, Pillaipakkam from Sriperumbudur 400KV SS (Reach III Loc.09 to 13)
2022_EB_243163_1
TP1-073/2022-23
Open Tender
Civil Works
Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.8 L
Yes
12 Aug 2022
21 Jul 2022
3 Aug 2022
21 Jul 2022
2 Aug 2022
21 Jul 2022
Amount
Fabrication and supply of GI Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions.
Fabrication and supply of HT Tower Parts, inluding stub & cleats as per specification including cost of all materials, labour, leads, and lifts etc., complete. GI – Tower Parts & Extenstions.
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply of hard ware’s for conductor as per IS conforming to latest issue. (Single Tension fittings for Zebra Conductor)
Supply of hard ware’s for conductor as per IS conforming to latest issue. Single suspension fittings for Zebra Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Vibration dampers for Zebra Conductor
Supply of hard ware’s for conductor as per IS conforming to latest issue. Mid span joint for Zebra
Supply of hard ware’s for conductor as per IS conforming to latest issue. Repair sleve for Zebra
Supply of hard ware’s for conductor as per IS conforming to latest issue. PA Rod for Zebra conductor
Labour charges for clearing of juliflora jungle for facilitating survey including cost of all labour, lead, lift etc., complete
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Leveling the site and removing scrub jungles and earth by engaging JCB with lead and lift etc., Complete
Providing & laying of RCC Hume pipe 1.20 M Dia to transport men and material of tower parts in canal area placing in correct position including cost of all materials, labour, lead, lift etc complete as directed by the dept. engineer at site.
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete.
Setting of piling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete.
Supplying, fabrication of 6mm MS sheet for making into circular casing shape to there required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour, lead, lift charges, etc., complete. For 500mm dia
Installation of vertical cast-in -situ borded RCC piles of 500 mm dia of suitable depth of 15m from basement floor level, using RCC M30 design mix and 20mm HBS, mixed with Conplast SP337 @300ml per bag of cement, providing temporary casing pipe of minimum length of 1m at top using drilling mud (Bentonite Slurry) of suitable of bore holes for the remaining length, concreting the pile through tremie pipes with minimum cement content of not less than 400KG /Cum of concrete incuiding the cost of all materials, labours lead, lift, T&P etc complete, but excluding the cost of reinforcement.
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
Assembling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. (LS Tower)
Assembling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. (KS Tower)
Assembling of templates required alingment and level including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site. (NMD Tower)
Earth work excavation in hard stiff clay, stiff black cotton hard red eareth, shales, murram, grvel stoney earth, earth mixed witrh small size boulders and hard gravelly soil including bailing or pumping charges if necessary etc. complete.
Shoring and shuttering using C.W. planks and C.W. scantlings including cost of all materials labour lead lift etc. complete as directed by the engineer at site.
Supplying and filling with M - sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
Plain cement concrete 1:3:6, 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
R:C:C 1:1:5:3 using 12 to 20mm metal with form work including cost of all materials, curing,labour, lead, etc., complete.
Chipping and dismantling of weak pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete.
Back filling of pits with excavated earth including watering and consolidation in 150 mm thick and spread balance earth around the location lead and lift etc., complete
Supllying and fixing of earthing including labour charges for earthing of towers to the required length and connecting to the tower leg and earth pipe with 2 nos bolts, nuts washer etc., complete
Labour charges for erection of towers including sorting out of towers parts tightaning punching of bolds and nuts and rectification of defects if any during erection cost of all meterials labours lead lift etc., complete. (Under LC condition)
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Labour charges for Transporting through head load and hoisting of 14 units 120 KN Ordinary Tension insulators with tension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for Transporting through head load and hoisting of 13 units 90 KN Ordinary suspension insulators with suspension fittings including all materials, labours, lead, and lift, etc., complete. (Under LC condition)
Labour charges for paying out of 3 Nos Zebra conductor with fittings including sorting out of conductor according to drum shedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete (Continuous span in KM)
Labour charges for rough sagging tensioning clipping of 3 nos Zeebra conductor with fitting including cost of T& P lead and lift etc., complete (Single span cut point) (Under LC condition)
Labour charges for paying out, Rough sagging, tensioning & clipping of 3 Nos Zeebra conductor with fittings including sorting out of conductor according to drum schdule and loading and unloading at site providing trussels and rough sagging tensionin, clipping cost of T & P lead and lift etc., complete (Single span cut point) Hot line stringing
Labour charges for paying out and stringing of 1no.OPGW with fittings cost of T&P lead and lift etc., complete (Continuous span)
Labour charges for rough sagging transioning clipping of OPGW with necessary fittings including cost of T&P lead and lift etc., complete (Single Span out point) (Under LC condition)
Providing Temporary stay during rough sagging and tensioning including necessary excavation burying anchor strucutures fixing stay wire refillings and removal of stays after tensioning with cost of all materials, all labour leads, lifts, etc., complete.
Arranging and attending shutdowns work on HT/LT, EHT lines, dismantling and restringing of HT/LT/EHT lines after completion of line stringing work including charges for T&Ps, transport all labour leads and lifts etc, complete ( one set means all the conductor and earth wire in the corresponding one no HT/LT/EHT line)
Painting tower legs using best qulity anticorroessive black paint two coats 1m above coping including cost of all materials labour lead lift complete in all respects.
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Number plate)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Danger Board)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Phase plate( Set of three)
Fabrication, supply, painting with one coat red oxide and two coat enamel paint for back ground lettering with enamel paint of approved colour fixing in tower as directed all materials labour lead lift etc., complete. (Name Board)
Providing plastering C:M 1 : 3 including cost of all materials labour lead, lift, etc., complete in all respect
Labour charges for releasing the existing conductor by rough sagging, clipping of 3 nos Zeebra conductor with fitting including cost of T& P lead and lift etc., complete and devoluting to stores
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete under LC/Normal condtion for 90 KN Disc Insulators and devoluting to stores
Dismantling the insulator string including cost of labour for releasing ,Tools and Plants transporting charges from site etc complete under LC/Normal condtion for 120 KN Disc Insulators and devoluting to stores
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .