| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 LAdmitted-Finance | ₹43.9 L | L1 | Admitted-Finance |
| 2 | L2₹44.3 L+₹35,200.94 (0.80%)Admitted-Finance | ₹44.3 L+₹35,200.94 (0.80%) | L2 | Admitted-Finance |
| 3 | L3₹46.5 L+₹2.5 L (5.76%)Admitted-Finance | ₹46.5 L+₹2.5 L (5.76%) | L3 | Admitted-Finance |
| 4 | L4₹46.7 L+₹2.7 L (6.25%)Admitted-Finance 64 SHAHEED UDHAM SINGH MARKET NEAR OLD BUS STAND BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹46.7 L+₹2.7 L (6.25%) | L4 | Admitted-Finance |
| 5 | L5₹47.4 L+₹3.5 L (7.93%)Admitted-Finance | ₹47.4 L+₹3.5 L (7.93%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s PANKAJ KUMAR L4 | M/s VISHAL ELECTRIC STORE L5 | M/s MITTAL CONSTRUCTIONS L6 | ANNPOORNA ENGINEERS & BUILDERS L7 | LM CONSTRUCTIONS L9 | Batra Builders L1 | AMIT CONTRACTOR L2 | RINKU BROTHERS L8 | M/S DHANPATI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brickwork or stone/boulder masonry built in cement mortar or cement-lime mortar, including quoins, arches, pillars, etc., of any description, including cleaning and stacking serviceable bricks for reuse and removing unserviceable materials and rubbish from the site, complete as specified and as directed by the Engineer-in-Charge. | 75 | Cubic Metre | 160 ₹12,000 | 200 ₹15,000 | 250 ₹18,750 | 155 ₹11,625 | 210 ₹15,750 | 150 ₹11,250 Lowest | 152 ₹11,400 | 220 ₹16,500 | 150 ₹11,250 Lowest |
| 2.00 | Marterial and Labour for brickwork with subclass ‘B’ bricks (old size bricks), in straight or curved work on plan exceeding 6 m mean radius, built in cement mortar (CM) 1:6, including all necessary scaffolding, curing, raking of joints, and completing the work in all respects as specified and directed by the Engineer-in-Charge. | 70 | Cubic Metre | 6,000 ₹4,20,000 | 6,000 ₹4,20,000 | 6,500 ₹4,55,000 | 5,855 ₹4,09,850 | 6,500 ₹4,55,000 | 5,800 ₹4,06,000 Lowest | 5,820 ₹4,07,400 | 5,800 ₹4,06,000 Lowest | 5,800 ₹4,06,000 Lowest |
| 3.00 | Marterial and Labour for brickwork with subclass ‘B’ bricks, in straight or curved work on plan to any radius, in half brick thick walls, built in cement mortar (CM) 1:4, including all necessary scaffolding, watering, curing, raking of joints, and completing the work in all respects as specified and directed by the Engineer-in-Charge. | 70 | Square Metre | 710 ₹49,700 | 800 ₹56,000 | 850 ₹59,500 | 755 ₹52,850 | 750 ₹52,500 | 700 ₹49,000 Lowest | 705 ₹49,350 | 900 ₹63,000 | 700 ₹49,000 Lowest |
| 4.00 | Taking down cement or cement-lime plaster from brick walls and other surfaces, including raking out joints, hacking the surface to provide key for new work, scrubbing down with water, and removing all debris, complete in all respects as specified and directed by the Engineer-in-Charge. | 850 | Square Metre | 25 ₹21,250 | 20 ₹17,000 Lowest | 20 ₹17,000 Lowest | 25 ₹21,250 | 25 ₹21,250 | 20 ₹17,000 Lowest | 20 ₹17,000 Lowest | 30 ₹25,500 | 20 ₹17,000 Lowest |
| 5.00 | Material and labour for plastering 15mm thick with ready mix cement plaster material on external surface of Brick walls/chajja/fins or concrete surfaces, finished even and fair complete all as specified and as directed. | 900 | Square Metre | 450 ₹4,05,000 | 450 ₹4,05,000 | 525 ₹4,72,500 | 455 ₹4,09,500 | 450 ₹4,05,000 | 400 ₹3,60,000 Lowest | 410 ₹3,69,000 | 500 ₹4,50,000 | 480 ₹4,32,000 |
| 6.00 | Material and labour for plastering 12mm thick with ready mix cement plaster material on internal surface of Brick walls or concrete surfaces, finished even and fair complete all as specified and as directed. | 450 | Square Metre | 450 ₹2,02,500 | 450 ₹2,02,500 | 525 ₹2,36,250 | 455 ₹2,04,750 | 450 ₹2,02,500 | 400 ₹1,80,000 Lowest | 410 ₹1,84,500 | 500 ₹2,25,000 | 480 ₹2,16,000 |
| 7.00 | Material and labour for preparation of new plastered surfaces, surface´after complete removal, applying acrylic putty on internal surfaces of walls/ceiling/soffits etc (thickness vary from 1.5 to 2 mm as required for desired smoothness and levelling of surfaces in two or more layers) by using readymade putty, including sanding with wall sander after filling the putty in first coat/second coat to make surface smooth and ready for receiving interior/exterior painting complete all as specified and as directed.
Notes : (i) The prepared surface after wall putty, the contractor will inform to the GE as well as to the Engineer-in-Charge for site inspection before applying further finishes. Please note that the further finishes work will start only after approval of the prepared surface from the GE as well as to the Engineer-in-Charge through site order.
Make of acrylic Putty: - Berger / Asian / Nerolac | 730 | Square Metre | 50 ₹36,500 Lowest | 50 ₹36,500 Lowest | 110 ₹80,300 | 65 ₹47,450 | 70 ₹51,100 | 60 ₹43,800 | 60 ₹43,800 | 60 ₹43,800 | 65 ₹47,450 |
| 8.00 | Material and labour for applying 02 coats of interior acrylic emulsion paint of approved tint/shade (Company Depot Tinted) @ 14.5 sq.m/litre/2 coats to wall surfaces (new or old prepared internal surface after complete removal and applying putty) over and including a coat of interior primer @ 11 sq.m/litre/1 coat (primer shall be same make as acrylic emulsion paint), paint and primer applying by using paint roller brush complete all as specified and as directed.
Note ;- Complete removal and putty shall be measured and paid separately under respective item of BOQ.
Brand and Make of interior acrylic emulsion paint: - Silk Glamour of Berger / Royal Aspira of Asian / Impression Eco Clean of Nerolac
Brand and Make of interior primer: - Seal O Primer of Berger / Smart Care Primero of Asian / Excel Alkali Prime of Nerolac | 280 | Square Metre | 70 ₹19,600 Lowest | 100 ₹28,000 | 110 ₹30,800 | 85 ₹23,800 | 120 ₹33,600 | 80 ₹22,400 | 82 ₹22,960 | 110 ₹30,800 | 85 ₹23,800 |
| 9.00 | Material and labour for applying 02 coats of exterior acrylic emulsion paint of approved tint/shade (Company Depot Tinted) @ 6 sq.m/litre/2 coats to external walls / Soffits of Chajjas / Roof Projections / Cantilevers / Balcony etc. (new or old prepared external surface after complete removal) over and including a coat of exterior primer @ 11 sq.m/litre/1 coat (primer shall be same make as acrylic emulsion paint), paint and primer applying by using airless spray gun complete all as specified and as directed.
Note ;- Complete removal shall be measured and paid separately under respective item of BOQ.
Brand and Make of exterior acrylic emulsion paint: - Weather Anti Dust of Berger / Apex Ultima of Asian / Excel Mical |Marble of Nerolac
Brand and Make of interior primer: - Seal O Primer of Berger / Smart Care Primero of Asian / Excel Alkali Prime of Nerolac | 450 | Square Metre | 80 ₹36,000 Lowest | 100 ₹45,000 | 110 ₹49,500 | 95 ₹42,750 | 120 ₹54,000 | 90 ₹40,500 | 85 ₹38,250 | 110 ₹49,500 | 110 ₹49,500 |
| 10.00 | Dismantling timber scantlings of 40 sq. cm and over in section, in any position, including careful removal, lowering, stacking of serviceable timber for reuse and removal of unserviceable materials from site, complete as specified and directed by the Engineer-in-Charge. | 4 | Cubic Metre | 1,100 ₹4,400 | 1,010 ₹4,040 | 2,500 ₹10,000 | 1,005 ₹4,020 | 1,200 ₹4,800 | 1,000 ₹4,000 Lowest | 1,010 ₹4,040 | 1,100 ₹4,400 | 1,000 ₹4,000 Lowest |
Tender Value
₹44.5 L
EMD Value
₹89,020
Closing Date
10 Sept 2026, 6:00 pmClosed
Jitender Singh IDSE
GE(N) Bathinda
SPL REPAIR OF BLDG. NO T-458 AND T-459 UNDER AGE B/R-V OF GE (N) BATHINDA AT BATHINDA MIL STN
2026_MES_783411_2
8941/NIT-25/26-27/E8
Open Tender
Civil Works
Item Rate
150 days
Bathinda
Class D Category a (i)
8 documents required · 8 mandatory
₹500
GE (North) Bathinda
₹89,020
Yes
14 Sept 2026
27 Aug 2026
12 Sept 2026
27 Aug 2026
10 Sept 2026
3 Sept 2026
27 Aug 2026 - 29 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brickwork or stone/boulder masonry built in cement mortar or cement-lime mortar, including quoins, arches, pillars, etc., of any description, including cleaning and stacking serviceable bricks for reuse and removing unserviceable materials and rubbish from the site, complete as specified and as directed by the Engineer-in-Charge. | 75 | Cubic Metre | - | - |
| 2 | Marterial and Labour for brickwork with subclass ‘B’ bricks (old size bricks), in straight or curved work on plan exceeding 6 m mean radius, built in cement mortar (CM) 1:6, including all necessary scaffolding, curing, raking of joints, and completing the work in all respects as specified and directed by the Engineer-in-Charge. | 70 | Cubic Metre | - | - |
| 3 | Marterial and Labour for brickwork with subclass ‘B’ bricks, in straight or curved work on plan to any radius, in half brick thick walls, built in cement mortar (CM) 1:4, including all necessary scaffolding, watering, curing, raking of joints, and completing the work in all respects as specified and directed by the Engineer-in-Charge. | 70 | Square Metre | - | - |
| 4 | Taking down cement or cement-lime plaster from brick walls and other surfaces, including raking out joints, hacking the surface to provide key for new work, scrubbing down with water, and removing all debris, complete in all respects as specified and directed by the Engineer-in-Charge. | 850 | Square Metre | - | - |
| 5 | Material and labour for plastering 15mm thick with ready mix cement plaster material on external surface of Brick walls/chajja/fins or concrete surfaces, finished even and fair complete all as specified and as directed. | 900 | Square Metre | - | - |
| 6 | Material and labour for plastering 12mm thick with ready mix cement plaster material on internal surface of Brick walls or concrete surfaces, finished even and fair complete all as specified and as directed. | 450 | Square Metre | - | - |
| 7 | Material and labour for preparation of new plastered surfaces, surface´after complete removal, applying acrylic putty on internal surfaces of walls/ceiling/soffits etc (thickness vary from 1.5 to 2 mm as required for desired smoothness and levelling of surfaces in two or more layers) by using readymade putty, including sanding with wall sander after filling the putty in first coat/second coat to make surface smooth and ready for receiving interior/exterior painting complete all as specified and as directed.
Notes : (i) The prepared surface after wall putty, the contractor will inform to the GE as well as to the Engineer-in-Charge for site inspection before applying further finishes. Please note that the further finishes work will start only after approval of the prepared surface from the GE as well as to the Engineer-in-Charge through site order.
Make of acrylic Putty: - Berger / Asian / Nerolac | - | Square Metre | - | - |
| 8 | Material and labour for applying 02 coats of interior acrylic emulsion paint of approved tint/shade (Company Depot Tinted) @ 14.5 sq.m/litre/2 coats to wall surfaces (new or old prepared internal surface after complete removal and applying putty) over and including a coat of interior primer @ 11 sq.m/litre/1 coat (primer shall be same make as acrylic emulsion paint), paint and primer applying by using paint roller brush complete all as specified and as directed.
Note ;- Complete removal and putty shall be measured and paid separately under respective item of BOQ.
Brand and Make of interior acrylic emulsion paint: - Silk Glamour of Berger / Royal Aspira of Asian / Impression Eco Clean of Nerolac
Brand and Make of interior primer: - Seal O Primer of Berger / Smart Care Primero of Asian / Excel Alkali Prime of Nerolac | 280 | Square Metre | - | - |
| 9 | Material and labour for applying 02 coats of exterior acrylic emulsion paint of approved tint/shade (Company Depot Tinted) @ 6 sq.m/litre/2 coats to external walls / Soffits of Chajjas / Roof Projections / Cantilevers / Balcony etc. (new or old prepared external surface after complete removal) over and including a coat of exterior primer @ 11 sq.m/litre/1 coat (primer shall be same make as acrylic emulsion paint), paint and primer applying by using airless spray gun complete all as specified and as directed.
Note ;- Complete removal shall be measured and paid separately under respective item of BOQ.
Brand and Make of exterior acrylic emulsion paint: - Weather Anti Dust of Berger / Apex Ultima of Asian / Excel Mical |Marble of Nerolac
Brand and Make of interior primer: - Seal O Primer of Berger / Smart Care Primero of Asian / Excel Alkali Prime of Nerolac | - | Square Metre | - | - |
| 10 | Dismantling timber scantlings of 40 sq. cm and over in section, in any position, including careful removal, lowering, stacking of serviceable timber for reuse and removal of unserviceable materials from site, complete as specified and directed by the Engineer-in-Charge. | 4 | Cubic Metre | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
Tenderdocuments25.pdf
Tender Documents • 1.25 MB
BOQ_881494.xls
BOQ • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .