| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.5 LAdmitted-Finance | ₹85.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹37.0 L (43.2%)Admitted-Finance | ₹1.2 Cr+₹37.0 L (43.2%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Disqualified on account of not meeting similar works criteria as per NIT condition |
| Sl No | Description | Qty | Unit | Top A India Contractors L2 | SEKAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling weather proofing old bitumen felt or App membrane sheets at all levels and cleaning the surface including disposal of rubbish to the dumping yard within 50 metres lead all as per specifications and directed by the Engineer-in-charge. | 5,500 | Sq.m. | 45 ₹2,47,500 | 30 ₹1,65,000 Lowest |
| 2.00 | Providing and constructing haunching of size 100mm X 100mm using CC 1:2:4 using 6mm down graded chips admixed with approved make of SBR latex at 1kg per 50kg (1 bag) of cement complete all as directed by Engineer-in-Charge. | 60 | Metres | 250 ₹15,000 | 130 ₹7,800 Lowest |
| 3.00 | Providing on the floor area by screeding with screed concrete of M20 grade with total minimum cementitious content (cement + fly ash content not exceed 20 % by weight of total cementitious content) 320kg/cum of concrete and minimum cement content of 256 Kg/cum of concrete (shall be using 10mm down aggregate) admixed with crystalline based integral water proofing admixture of approved make at the ratio of 0.8% by weight of cement (or as per manufacturer recommendation) to the required thickness and slope at terrace water proofing including applying one coat of SBR polymer modified cementitious bond coat at 2.2 kg cement per sqm of surface area mixed with specified proportion (at 10% of cement weight or as per manufacturer specification) of SBR polymer of approved make over the prepared surface at all locations and all elevation and specification and as directed by the Engineer-in-Charge. Note: 1) The area shall be tested for any leakage by ponding of water (water holding test) before and after application of treatment in panels. (panels shall be made by least ratio of cement mortar and the same shall be thoroughly cleaned before receiving further treatment). 2) This item shall include placing the pumpable concrete by boom placer, concrete pump, supply of RMC concrete in Transit mixer as directed by Engineer-in-charge if bulk quantity is required according to the site conditions. 3) Concrete shall be placed in layers in such a way that fibre glass mesh (if required by Engineer-in-Charge) will be fixed in between layers and fixing of fibre glass mesh shall be paid under separate item. | 15 | Cu.m. | 9,000 ₹1,35,000 Lowest | 10,500 ₹1,57,500 |
| 4.00 | Supplying and fixing in all position of Alkali resistance Glass fibre mesh of Gyproc Fiber Mesh or approved equivalent (4-5mm square aperture or as per specified at site with 145 gsm) fixed with neat cement paste or by manufacturer recommendation fixed below screed concrete with minimum 100mm overlapping at mesh joints and as instructed by Engineer-in-Charge. | 285 | Sq.m. | 200 ₹57,000 | 140 ₹39,900 Lowest |
| 5.00 | Providing water proofing treatment to the RCC cast insitu terrace and gutters using ‘CERA WP SHIELD P4180 / Fosroc Torchseal 4PI or approved equivalent’ 4mm thick and ‘CERA WP SHIELD SLATED / Fosroc Torchseal 4PI or approved equivalent’ 4mm thick as per specifications and as directed by the Engineer-in-Charge for following. a) The existing tarfelt, bituminous primer, WP Tiles and foam concrete, waterproofing membranes & cement based water proofing treatment, and all types of water proofing treatment shall be removed completely by cutting and peeling off from the surface and disposing the same 50m beyond the building area. b) V grooves shall be cut along the surface crack, along the construction joints on wall - slab joints and the same shall be filled with cementitious non shrink grout ‘Cera Grout 40 / Fosroc Conbextra GP / SikaGrout-214 IN S or approved equivalent’. c) The area shall be tested for any leakages by ponding of water (water holding test) before and after application of treatment in panels. (panels shall be made by least ratio of cement mortar and the same shall be thoroughly cleaned before receiving further treatment). Incase of any leaks found, Foam grouting shall be done, which will be paid under relevant item. d) When the entire surface is water-tight, dry and moisture free, one coat of bituminous primer shall be applied over surface @ 0.3 kg/sqm and 1st layer of 5 - layered, 4mm thick, polymer reinforced APP membrane WP SHIELD P4180 from CERA / Torchseal 4PI from FOSROC / SIKA shall be laid with 200mm overlapping by torch - on application when the primed surface is tacky and as per the manufacturers recommendation. e) The second layer of 4 or 5 - layered, 4mm thick, polymer reinforced APP membrane WP SHIELD - SLATED from CERA / Torchseal 4PI from FOSROC / SIKA shall be laid with 200mm overlapping by torch - on application when the primed surface is tacky and as per the manufacturers recommendation shall be laid in perpendicular direction to the first layer. Note: i) The treatment should be done by an agency specialised in the job having sufficient knowledge of water proofing treatment. Suggested vendors : (1) M/s. Cera-Chem Pvt. Ltd., Chemicals (2) M/s. Fosroc Chemicals (3) M/s. Sika India Pvt. Ltd. Chemicals ii) This item includes for lifting of material at higher elevation. iii) Ten years guarantee shall be given by the contractor in the prescribed form of the department for the above water proofing treatment work | 5,500 | Sq.m. | 2,000 ₹1,10,00,000 | 1,320 ₹72,60,000 Lowest |
| 6.00 | Supplying and providing the approved make of STRIP SEAL upto 250mm width Expansion joint strip treatment for Roof slab/vertical wall area including chipping & surface preparation, applying adhesive as per strip seal manufacturer recommendation over the roof slab expansion joint to a minimum width of 50mm and aligning to the required line, overlapping of minimum 100mm of strip with suitable rubber adhesive, carefully removing of air pockets & wrinkles, including providing and fixing approved quality of polyethylene/high quality foam backer rods with approved sealant/adhesive, including chipping the existing water proofing, treatment with approved SBR latex coating at 1kg per 50kg of cement, 2.2kg cement per sq.m. with 600mm wide (300mm on expansion joint and 300mm on roof slab) on both side of joints, complete all as specification and as directed by Engineer-in-Charge. Note: The area shall be tested for any leakages by ponding water in panels. In case of any leaks found grouting shall be done with contractor cost. | 30 | Metres | 2,600 ₹78,000 | 1,500 ₹45,000 Lowest |
| 7.00Conveying the surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil and @ 50% in respect of Rock from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road. | |||||
| 7.01 | Lead charges for lead Exceeding 4 kilometre but not exceeding 5 kilometre | 300 | Cu.m. | 300 ₹90,000 | 280 ₹84,000 Lowest |
| 8.00 | Cleaning the sun shades roof gutters/ rain water gutters at all levels of various building, removing the vegetation growth and cleaning the drain pipes, spouts periodically as and when required, conveying the removed unwanted materials to the bins as directed, cutting and making opening in brick masonry, RCC concrete, removing the debris, disposing off as directed, attending the masonry repairs and making good the sides of hole packing the removed portion of the inside by filling concrete / brick work including finishing the surfaces etc. construction of brick masonry foundation walls wherever required etc. complete all as directed by the Engineer-in-Charge. | 250 | Jobs | 800 ₹2,00,000 Lowest | 800 ₹2,00,000 Lowest |
| 9.00 | Providing and fixing double Tubular scaffolding system using H-Frames / APS system or (cup lock type) on the exterior side made with 40mm dia M.S. tube 1.5m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in-Charge. Note : 1. The elevation area of the scaffolding shall be measured for payment purposes. 2. The payment shall be made once irrespective of duration of scaffolding. 3. The scaffolding system drawing shall be got approved by Engineer-in-Charge. 4. The contractor has to observe all safety procedure while working on heights as per I.S. 3696 (Part-I) (Safety Code for scaffolds). 5. Screen of suitable material shall be provided to the full height of scaffolding and securely tied to protect falling objects coming out during the work is in progress. 6. Necessary aluminium / M.S. ladder shall be provided at the cost of the contractor, to the full height of scaffolding at required location around the building to enable Departmental Supervisor/Engineer climb up and closely watch the repair work of the building. | 2,100 | Sq.m. | 200 ₹4,20,000 Lowest | 280 ₹5,88,000 |
Tender Value
₹82.0 L
EMD Value
₹1.6 L
Closing Date
15 Apr 2026, 11:30 amClosed
Chief Engineer, CEG
Room No. 222, CDO Building, Indira Gandhi Centre for Atomic Research, Kalpakkam - 603102.
Repairing the damaged water proofing at folded plate roof terrace of central stores building in IGCAR, Kalpakkam.
2026_IGCAR_904242_1
CEG/IGC/2181/2026
Open Tender
Civil Works
Item Rate
240 days
Kalpakkam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
10 Jun 2026
1 Apr 2026
16 Apr 2026
2 Apr 2026
15 Apr 2026
3 Apr 2026
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
2181Undertakingsandformoftender.pdf
Tender Documents • 0.22 MB
BOQ_950435.xls
BOQ • 0.28 MB
2181FormsACDFGHforfillinganduploading.xls
Tender Documents • 0.08 MB
2181technicalbid.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .