Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC 189 15 GANDHI NAGAR SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | ₹1.7 L | 1 | Accepted-AOC ok |
| 2 | 2₹1.7 L+₹3,131 (1.86%)Rejected-Finance | ₹1.7 L+₹3,131 (1.86%) | 2 | Rejected-Finance 3 |
| 3 | 3₹1.9 L+₹18,523 (11.0%)Rejected-Finance E 32 FF SUSHANT LOK PHASE 3 EXT SECTOR 57 | ₹1.9 L+₹18,523 (11.0%) | 3 | Rejected-Finance 2 |
| 4 | Not Admitted-Fee/PreQual/Technical 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | - | - | Not Admitted-Fee/PreQual/Technical Others-Enough Co-Operative Society Bidder. |
| 5 | Not Admitted-Fee/PreQual/Technical 17 VII MOLAHERA SEC 22 GURUGRAM 122015 | GURUGRAM | GURUGRAM | HARYANA | 122015 | - | - | Not Admitted-Fee/PreQual/Technical Others-Enough Co-Operative Society Bidder. |
Tender Value
₹1.9 L
EMD Value
₹3,760
Closing Date
13 Aug 2026, 5:00 pmClosed
Davender Singh
Horticulture Gurugram
Planting of Hedge Plants and Specimen tree plants in Green Belt near Plot No. 1072 to 1138 in Sector-37-C Gurugram
2026_HBC_539076_1
20264A727B91 1CB6 4F79 99CA 484AB7A6AAE3261HSV
Open Tender
Civil Works
Works
90 days
Gurugram
2 documents required · 2 mandatory
₹250
₹3,760
Yes
21 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
6 Aug 2026 - 8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth, mixed with farm-yard manure, supplied at the rate of 1.62 cum per 18 sqm, DAP 0.6kg, Chlorpyriphos 20%EC@ 0.20 litre per 18 sqm and supplying and planting hedge at 30 cm apart in two rows @ 202 no. well trimmed bushy ,multi-branched ,30 cm to 45 cm in height plants to be supplied in 15 cm x 15 cm poly bags per 18 sqm | 440 | Sqm | 230 | ₹1,01,200 |
| 2 | Maintaining the hedges for one year including watering, hoeing weeding trimming and shaping
,replacement of casualty as and when noticed, application of Farm yard manure @ 0.0127 m layer over surface, application of insecticide
chlorpyriphos @ 2ml per sqm twice , urea @40gm and DAP @10 gm per sqm once in a year | 440 | Sqm | 61.25 | ₹26,950 |
| 3 | Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per plant 27 no irrigations per year, lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover / flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year | 24 | Trip | - | - |
| 4 | Supply and Planting rare and specimen tree plants in already prepared pits (Ficus starlight 150 cm height, Terminalia 210 cm height, menatalis, Michelia champaca hybrid more than 180 cm height, Cyprus (Golden juniperous ) more than 180 cm height, topiary of 10 to 12 no. well trimmed bolls of more than 30cm size of Ficus nuda, Ficus retusa, Ficus long island , Ficus panda more than 180 cm height, Golden bottle brush , casurina equistefolia , Bottle palm with stem circumference at base more than 40cm ,Washingtonia palm of healthy clear stem height below leaf more Thant 90 cm ) including , fertilizer and insecticides chlorpyriphos 20 ml per pit, planting of 180cm to 210cm tall sapling in position and flooding with water .specie of plant will be decided by engineer in charge. | 42 | Each | - | - |
| 5 | Maintenance of specimen tree for one year including weeding, hoeing , plant protection , watering from Deptt. source , application of 20 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 gm DAP twice ,replacement of casualty disposal of debris and other activities.etc | 42 | Each | 145.5 | ₹6,111 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_618320.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .