Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Finance | -41.00% | ₹17.7 L | L1 | Admitted-Finance |
| 2 | L2₹18.0 L+₹29,997.02 (1.69%)Admitted-Finance | -40.00% | ₹18.0 L+₹29,997.02 (1.69%) | L2 | Admitted-Finance |
| 3 | L3₹18.4 L+₹71,992.86 (4.07%)Admitted-Finance | -38.60% | ₹18.4 L+₹71,992.86 (4.07%) | L3 | Admitted-Finance |
| 4 | L4₹20.1 L+₹2.4 L (13.8%)Admitted-Finance | -32.86% | ₹20.1 L+₹2.4 L (13.8%) | L4 | Admitted-Finance |
| 5 | L5₹20.4 L+₹2.7 L (15.4%)Admitted-Finance | -31.90% | ₹20.4 L+₹2.7 L (15.4%) | L5 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
1 Jun 2026, 4:00 pmClosed
Executive Engineer
Mahore Irrigation Division Dharmari
Construction of Flood Protection work at Gota along Ans River down side of Choda Bagla Village and Block Chassana District Reasi under SASCI.
2026_IFC_310493_1
eNIT No. 06 of 2026-27 dated 21-05-2026
Open Tender
Civil Works
Piece-work
75 days
Gota
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer
₹60,000
3 Jun 2026
21 May 2026
2 Jun 2026
21 May 2026
1 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 442.8 | cum | 256.85 | ₹1,13,733.18 |
| 2 | Ordinary Rock | 110.7 | cum | 493.5 | ₹54,630.45 |
| 3 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 1,411.43 | cum | 371.15 | ₹5,23,850.39 |
| 4 | Supply of stones including cost of stones for wire crates | 1,129.14 | cum | 700 | ₹7,90,398 |
| 5 | Providing and Fixing of B.A knitted waire crates of 6 x 1.5 x 1.5 m and mesh size 100 mm x 100 mm of wire 4 mm dia with lids. | 123 | Nos. | 5,000 | ₹6,15,000 |
| 6 | Carriage of Stone for an average distance of 1.0 Km by Mechanical transport. | 1,129.14 | cum | 151.47 | ₹1,71,030.84 |
| 7 | Carriage of Stone for an average distance of 400 Mtrs by Head Load. | 1,129.14 | cum | 595.88 | ₹6,72,831.94 |
| 8 | Carriage of knitted wire crates for an average 160 km by Mechanical Transport. | 8.86 | MT | 5,801.95 | ₹51,405.28 |
| 9 | Carriage of knitted wire crates for an average 1500 Mtrs by Head Load. | 8.86 | MT | 770.01 | ₹6,822.29 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1004353.xls
BOQ • 0.34 MB
Addendum.pdf
PDF • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .