Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance ALIGARH | UTTAR PRADESH | 202001 | ₹3.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.2 LRejected-Finance | ₹4.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.3 LRejected-Finance | ₹4.3 L | L3 | Rejected-Finance L3 |
| 4 | L4₹4.8 LRejected-Finance | ₹4.8 L | L4 | Rejected-Finance L4 |
| 5 | L5₹4.9 LRejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹4.9 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Harish Kumar Contractor L5 | DEVENDRA KUMAR SHARMA L1 | Jagannath prasad L2 | M/S YAMUNA EARTH MOVERS L3 | NAND KISHOR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 1,964 | M2 | 23.92 ₹46,970.04 | 22 ₹43,208 | 24.12 ₹47,371.68 | 25.65 ₹50,376.60 | 27.3 ₹53,617.20 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 7,854 | M2 | 2.73 ₹21,466.55 | 2.5 ₹19,635 | 3.03 ₹23,797.62 | 3.22 ₹25,289.88 | 3.43 ₹26,939.22 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 12,095 | M3 | 35.07 ₹4.2 L | 27 ₹3.3 L | 28.94 ₹3.5 L | 29.32 ₹3.5 L | 32.76 ₹4.0 L |
Tender Value
₹7.2 L
EMD Value
₹15,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal Clearance Work of Raya Biyonhi Drain Drain Between Km 36.000 to Km. 41.200
2026_UPIDC_1148556_12
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹15,000
2 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 1,964 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 7,854 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 12,095 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150034.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid