Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 0 QAIMOH QAIMOH KULGAM KULGAM JAMMU KASHMIR 192231 | KULGAM | JAMMU AND KASHMIR | 192231 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
7 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Exe Engineer
Irrigation Div Kulgam
Construction of lining wall on Sarbal Ladi near breached spot at Ziyarat Sharief Gofbal Qaimoh Sadrimouj
2021_IFC_118580_8
E NIT 16 of 2020 21
Open Tender
Civil Works - Canal
Item Rate
10 days
kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
8 Mar 2021
28 Feb 2021
8 Mar 2021
28 Feb 2021
7 Mar 2021
28 Feb 2021
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Centering and shuttering including strutting, propping etc. and removal of form for: b. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Dumping stone including supply of Nallah stones. in Horizontal on level.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of materials from source to road site of work by mechanical transport and from road site to actual site of work by manual labour / head load. a. Stone agg / sand avg 05 kms by MT and 100 mts by HL
b. Cement avg 15 kms by MT and 100 mts by HL
c. Boulders avg 5 kms by MT and 100 mts by HL
NAZIR AHMAD RATHER
ARSHEED AUYOOB
stage.html
html • 0.02 MB
finance_227729.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .