| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.9 L+₹823.64 (0.17%)Rejected-Finance TAMIL NADU | TIRUVANNAMALAI | TAMIL NADU | 604401 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | kanagavali L1 | KUMAR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Culvert at Amarapuram Eralacheri Road Amarapuram in Ayarpadi Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 57.38 | cum | 246 ₹14,115 Lowest | 250 ₹14,345 |
| 3.00 | Plain Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete | 4.98 | cum | 5,106 ₹25,428 Lowest | 5,200 ₹25,896 |
| 4.00 | Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 43.18 | cum | 5,429 ₹2,34,424 Lowest | 5,429 ₹2,34,424 Lowest |
| 5.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete | 107.28 | sqm | 514 ₹55,142 Lowest | 514 ₹55,142 Lowest |
| 6.00 | Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete (Bed Block) | 10.74 | sqm | 1,029 ₹11,051 Lowest | 1,029 ₹11,051 Lowest |
| 7.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 3.07 | cum | 6,485 ₹19,909 Lowest | 6,485 ₹19,909 Lowest |
| 8.00 | Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.79 | cum | 8,802 ₹24,558 Lowest | 8,802 ₹24,558 Lowest |
| 9.00 | Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification | 0.38 | MT | 89,920 ₹33,720 Lowest | 89,920 ₹33,720 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 75,302.46 ₹75,302.46 Lowest | 75,428.1 ₹75,428.1 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
29 Sept 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICE
Construction of Culvert at Amarapuram Eralacheri Road Amarapuram in Ayarpadi Panchayat
2025_RDTN_609516_1
A1/193/2025
Open Tender
Civil Works
Item Rate
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
Yes
30 Oct 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
29 Sept 2025
27 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .