| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | ₹3.9 Cr | L1 | Accepted-Finance Bidder quoted L1 rates |
| 2 | L2₹4.2 CrRejected-Finance 61 LAALA LAJPAT RAI COLONY BHOPAL M P 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹4.2 Cr | L2 | Rejected-Finance Bidder not quoted L1 rates |
| 3 | L3₹4.3 CrRejected-Finance 5 KEDAR APARTMENTS 484 60 PARVATI MITRAMANDAL COLONY PARATI PUNE 411 009 | PUNE | PUNE | MAHARASHTRA | 411009 | ₹4.3 Cr | L3 | Rejected-Finance Bidder not quoted L1 rates |
| 4 | Rejected-Technical | - | - | Rejected-Technical DD not as per NIT condition and I.P. not uploaded / submitted. |
| Sl No | Description | Qty | Unit | Mehta Construction Co. L3 | S G Enterprises L1 | SHREE KRISHNA INFRASTRUCTURE L2 |
|---|---|---|---|---|---|---|
| 1.00SCH 'A' PART-I: BUILDING/STRUCTURES Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | ||||||
| 1.01 | Construction of Pump House building complete all as shown on arch and structural drawings complete all as specified and directed. | 1 | EACH BLOCK | 9,25,000 ₹9.3 L | 7,65,850 ₹7.7 L | 8,75,000 ₹8.8 L |
| 1.02 | Construction of Under Ground (UG) Sump of capacity 25000 Gallon complete all as shown on arch and structural drawings complete all as specified and directed. | 1 | EACH BLOCK | 45,35,000 ₹45.4 L | 35,52,550 ₹35.5 L | 45,00,000 ₹45 L |
| 1.03NOTE: Schedule ‘A’ Part II to VIII items have been Prepriced by MES and the Bidders shall insert their lumpsum cost in green field under Column-6 only. | ||||||
| 2.00 | Total amount of Sch 'A' Part-II (EARTHWORK AND EXCAVATION, SITE CLEARANCE & DEVELOPMENT) | 1 | LUMP SUM | 6,57,850 ₹6.6 L | 7,35,028 ₹7.4 L | 8,98,077.14 ₹9.0 L |
| 3.00 | Total amount of Sch 'A' Part-III (B&R ITEMS) | 1 | LUMP SUM | 1,25,03,200 ₹1.3 Cr | 1,30,25,872 ₹1.3 Cr | 1,46,25,503.61 ₹1.5 Cr |
| 4.00 | Total amount of Sch 'A' Part-IV (INTERNAL ELECTRIFICATION) | 1 | LUMP SUM | 29,27,150 ₹29.3 L | 25,45,200 ₹25.5 L | 27,96,802.32 ₹28.0 L |
| 5.00 | Total amount of Sch 'A' Part-V (AIR CONDITIONING & REFRIGERATION) | 1 | LUMP SUM | 11,22,520 ₹11.2 L | 14,50,000 ₹14.5 L | 13,47,166.75 ₹13.5 L |
| 6.00 | Total amount of Sch 'A' Part-VI (FIRE FIGHTING SYSTEM) | 1 | LUMP SUM | 23,75,250 ₹23.8 L | 24,50,000 ₹24.5 L | 22,23,898.25 ₹22.2 L |
| 7.00 | Total amount of Sch 'A' Part-VII (EXTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | 9,90,150 ₹9.9 L | 10,25,000 ₹10.3 L | 11,17,446.75 ₹11.2 L |
Updated dates
Tender Value
₹3.9 Cr
EMD Value
₹2.7 L
Closing Date
23 May 2026, 6:00 pmClosed
COMMANDER WORKS ENGINEER PUNE - 01
HEADQUARTERS COMMANDER WORKS ENGINEERS GEN CARIAPPA MARG, PUNE-411 001
81812 ADDITION / ALTERATION OF ACCIDENT AND EMERGENCY DEPT (MI ROOM) OF MH AT NDA KHADAKWASLA
2025_MES_746288_3
81812 CWE PUNE
Open Tender
Civil Works
180 days
GE KHADAKWASLA
As per Tender Documents
8 documents required · 8 mandatory
₹2,000
GE KHADAKWASLA
₹2.7 L
Yes
23 Jun 2026
2 May 2026
28 May 2026
2 May 2026
23 May 2026
9 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCH 'A' PART-I: BUILDING/STRUCTURES
Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only | - | - | - | - |
Construction of Pump House building complete all as shown on arch and structural drawings complete all as specified and directed. | 1 | EACH BLOCK | - | - | |
Construction of Under Ground (UG) Sump of capacity 25000 Gallon complete all as shown on arch and structural drawings complete all as specified and directed. | 1 | EACH BLOCK | - | - | |
| 2 | Total amount of Sch 'A' Part-II (EARTHWORK AND EXCAVATION, SITE CLEARANCE & DEVELOPMENT) | 1 | LUMP SUM | - | - |
Total amount of Sch 'A' Part-III (B&R ITEMS) | 1 | LUMP SUM | - | - | |
Total amount of Sch 'A' Part-IV (INTERNAL ELECTRIFICATION) | 1 | LUMP SUM | - | - | |
Total amount of Sch 'A' Part-V (AIR CONDITIONING & REFRIGERATION) | 1 | LUMP SUM | - | - | |
Total amount of Sch 'A' Part-VI (FIRE FIGHTING SYSTEM) | 1 | LUMP SUM | - | - | |
Total amount of Sch 'A' Part-VII (EXTERNAL ELECTRIC SUPPLY) | 1 | LUMP SUM | - | - | |
Total amount of Sch 'A' Part-VIII (SEWAGE DISPOSAL) | 1 | LUMP SUM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_854825.xls
BOQ • 0.51 MB
Drg_PumpHouse.pdf
Additional Documents • 9.09 MB
81812NIT_Revised.pdf
Additional Documents • 0.74 MB
81812TenderDocs.pdf
Tender Documents • 6.36 MB