Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.5 Laccepted-aoc | ₹2.5 L | accepted-aoc |
Tender Value
₹2.6 L
EMD Value
₹7,000
Closing Date
29 Jun 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
RAJNIKANTH SRINGERI
Shifting of 250KVA HT installation Mini vidhansouda in Jewargi Taluka under KKRDB
RDPR/2025-26/EL/WORK_INDENT23050/CALL-3
RDPR/2025-26/EL/WORK_INDENT23050/CALL-3
Open
Electrical
Electronic Documents, First(One Cover)
RDPR Division Office Kalaburgi
6 documents required · 6 mandatory
₹500
₹7,000
29 Jun 2026
17 Jun 2026
29 Jun 2026
Shifting of 250KVA HT installation Mini vidhansouda in Jewargi Taluka under KKRDB
Structure with 9 Mtrs RCC P 2791002-DP with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specifica...
Structure with 9 Mtrs RCC P 2791002-DP in Hard soil with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as ...
Releasing Of Hard Soil with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and directi...
Releasing Of Same as above using RCC poles 9 mtr to 10 mtr long with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., comp...
Same as above using RCC poles 9 mtr to 10 mtr long with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as p...
G.O.S.Mounting H-Frame se 279149-11kV with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specificat...
Errection of H Frame with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and direction...
Releasing Of H Fram with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specification and direction...
AB cable Straight Thru J 284848-11 Kv with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specificat...
AB Cable Straight thru joint installation for 3 Core11 Kv with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete a...
Releasing Of 11kV AB Cable Straight thru joint installation for 3 Corewith all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc....
LT UG cable allumi 287150-1.1kv class with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specificat...
G.O.S 200A Single break 304212-11kV with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specificatio...
Fixing of GOS including wiring (11kV SB 200A) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per sp...
Releasing Of Fixing of GOS including wiring (11kV SB 200A) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete...
HT Metering Cubica 358261-11 Kv Class with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per specificat...
Releasing Of HT metering Cubicle on Platform with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and as per spe...
Rleased steel from RCC Poles (Skeleton rods) 790103-d with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments ncidental Charges etc., complete and a...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
2 Works KKRDB.pdf
Others - Notification • 0.60 MB
Bid Document.doc
Tender Document • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .