Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC SHANTINAGAR SHIVNANDANPUR BISHRAMPUR BISHRAMPUR SURGUJA CHHATTISGARH 497226 | SURAJPUR | CHHATTISGARH | 497226 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹2.3 L+₹17,365.60 (8.13%)Rejected-Finance AT BONGA ITKHORI CHATRA | CHATRA | JHARKHAND | 825103 | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹2.4 L+₹25,074.20 (11.7%)Rejected-Finance SHANTI NAGAR BISHRAMPUR DISTT SURAJPUR C G | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹2.8 L+₹66,202.04 (31.0%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 |
Tender Value
₹5.2 L
EMD Value
₹6,550
Closing Date
21 Mar 2023, 5:00 pmClosed
Chief Manager (C)/OSD
Chief Manager (C)/OSD SECL G.M. Office Bishrampur Area
Public Information safety precaution sign board of Bishrampur ocp of Bishrampur Area.
2023_SECL_273760_1
GM/BSPR/Civil/e-tender/ 2022-23/76 Dt.04.03.2023
Open Tender
Civil Works - Others
Item Rate
60 days
Bishrampur OCP
As Per NIT
3 documents required · 3 mandatory
₹6,550
27 Jun 2023
6 Mar 2023
23 Mar 2023
6 Mar 2023
21 Mar 2023
7 Mar 2023
6 Mar 2023 - 13 Mar 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement : 1.3 coarse sand : 3 graded stone aggregate 20 mm nominal size).
Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers, abutments, pillars, postsstruts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excludingthe cost of centering, shuttering and finishing:1:1.5:3 (1 Cement : 1.3 coarse sand : 3 graded stone aggregate 20 mm nominal size)
6 mm cement plaster of mix 1:3 (1 cement : 3 fine sand)cement
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and stringcourses etc.
Painting and writing sign boards of steel ,wall,concrate surface including praperation of surface etc. as per instrucion of the engineer in chage .
Total impact of GST for the purpose of CTC
SUNIL KUMAR SINGH
Rakesh Bahadur Singh
ADITYA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_283305.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .