| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.4 LAccepted-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L1 | Accepted-Finance Accepted | |
| 2 | L2₹65.9 L+₹46,024.93 (0.70%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹66.1 L+₹70,802.46 (1.08%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | WEST BENGAL ENGINEERING CO. L1 | DAS ENTERPRISE L2 | EASTERN INDIA SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00 | INTAKE : - Sub-Station
Operation & Guarding of indoor Sub-Station for Transformer
11/0.433. KV (2 x 630KVA ) for operation and guarding of Substation equipment’s at Intake with all accessories engaiginh for 2 (two) nos. operating personnel as per direction of E.I.C (Including Bonus, EPF ESI) | 365 | /day | 1,406 ₹5,13,190 Lowest | 1,407 ₹5,13,555 | 1,408 ₹5,13,920 |
| 2.00 | Pumping Machinery
Operation and guarding of all vertical turbine pumping machinery each having motor capacity of 150 KW including others pumps, L.T. PDB panel , MCC Panel individual Soft starter panels,electrical gadgets, actator operated butterfly valves, flow meters, level indicators etc installed at intake pumping station and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaging 3(Three) nos operating personnel as per direction of E.I.C (Including Bonus, EPF ESI) | 365 | /Day | 2,109 ₹7,69,785 Lowest | 2,111 ₹7,70,515 | 2,113 ₹7,71,245 |
| 3.00 | Testing and calibrationand different relays, breakers, for smooth
operation of 2 x 630 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months) [Payment to be made only after submiting of nesessary report] | 2 | L.S | 48,950 ₹97,900 Lowest | 50,500 ₹1,01,000 | 50,650 ₹1,01,300 |
| 4.00 | WTP: -
Operation, guarding of clear water Pump 3 nos. (2W + 1S) each of 110 KW Back wash pumping machineries 25 KW , Dewatering water pumps, L.T. PDB panel cum MCC panels of individual Soft starter panels, Pump Control Panel, along with other accessories and electrical gadgets, actuator operated butterfly valves, flow meters, level indicators etc an inside the WTP pumping station and internal and external illumination complete with all other electrical accessories and ancilliaries indoor Sub-Station for Transformer 11/0.433. KV (2 x 800KVA) for operation and guarding of Substation equipment’s for round the clock supply of drinking water by engaging 4(Four) nos operating personnel as per direction of E.I.C. (Including Bonus, EPF ESI) | 365 | /Day | 2,812 ₹10,26,380 Lowest | 2,814 ₹10,27,110 | 2,816 ₹10,27,840 |
| 5.00 | GASEOUS CHLORINATION PLANT AT CLEAR WATER Operation & guarding of gaseous chlorination system two(2) Set installed at site for feeding chlorine gas in the drinking water for disinfection of the same by engaging 2(Two) nos operating personnel as per direction of E.I.C
(by Dep’t.supplied Chlorine Gas )(Including Bonus, EPF ESI) | 365 | /Day | 1,406 ₹5,13,190 Lowest | 1,407 ₹5,13,555 | 1,408 ₹5,13,920 |
| 6.00 | Supervision charges for Gas Plant by Gas Plant Supervision and the cost of visit charges of the Gas Plant Supervisor at least two day in a month along with expart technician for servision of the installation for the above period as per direction of E.I.C | 12 | /Month | 7,868 ₹94,416 Lowest | 7,890 ₹94,680 | 7,900 ₹94,800 |
| 7.00 | Routine & Periodical inspection by electrical supervisor having
valid suprevisor's certificate of competency from directorate of Electricity (Licensing board), Govt. of West Bengal or under any other State Government of India along with Pump Technician / Supervisor for checking of Pumping station, Sub-Station D.G Set, L.T and H.T equipments PDB panel, MCC/ Starter panels for all pumping machineries, indoor & out door lighting , valves with actuators along with all other electro mechanical installation e.g. level indicator, flow meter to keep the system in healthy condition.
N.B-Minimum 2 day in a month and each visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building . | 12 | /Month | 8,678 ₹1,04,136 Lowest | 8,685 ₹1,04,220 | 8,700 ₹1,04,400 |
| 8.00 | Testing and calibrationand different relays, breakers, for smooth operation of x 800 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months)
[Payment to be made only after submiting of nesessary report] | 2 | L.S | 48,950 ₹97,900 Lowest | 50,500 ₹1,01,000 | 50,650 ₹1,01,300 |
| 9.00 | Cost of refilling of 900kg empty cylenders from authorised liquid chlorine refilling station including charges of testing of cylenders, transpotation etc all complete as per technical Specifications given in NIT | 12 | L.S | 52,410 ₹6,28,920 Lowest | 52,450 ₹6,29,400 | 52,500 ₹6,30,000 |
| 10.00 | Annual internet data maintanace charges of 33(thirty three) nos SIM and cable internet cannection and cloud charges as per direction of E.I.C | 1 | L.S | 1,45,000 ₹1,45,000 Lowest | 1,46,500 ₹1,46,500 | 1,48,000 ₹1,48,000 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
27 Jul 2026, 12:35 pmClosed
Executive Engineer, BMD, PHED
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Operation and Guarding of pumping machineries, and 2 x 630 KVA, and 2 x 800KVA sub-station SCADA system and other Electro mechanical installation at Plasto Industrial park Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte
2026_PHED_1026786_132
WBPHED/EE/BMD/NIeT-3 OF 2026-2027
Open Tender
MECHANICAL
Item Rate
365 days
Bankura
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.3 L
Yes
29 Sept 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | INTAKE : - Sub-Station
Operation & Guarding of indoor Sub-Station for Transformer
11/0.433. KV (2 x 630KVA ) for operation and guarding of Substation equipment’s at Intake with all accessories engaiginh for 2 (two) nos. operating personnel as per direction of E.I.C (Including Bonus, EPF ESI) | 365 | /day | - | - |
| 2 | Pumping Machinery
Operation and guarding of all vertical turbine pumping machinery each having motor capacity of 150 KW including others pumps, L.T. PDB panel , MCC Panel individual Soft starter panels,electrical gadgets, actator operated butterfly valves, flow meters, level indicators etc installed at intake pumping station and internal & external illumination complete with all other electrical accessories and ancilliaries for round the clock supply of water by engaging 3(Three) nos operating personnel as per direction of E.I.C (Including Bonus, EPF ESI) | 365 | /Day | 1 | ₹365 |
| 3 | Testing and calibrationand different relays, breakers, for smooth
operation of 2 x 630 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months) [Payment to be made only after submiting of nesessary report] | 2 | L.S | 2 | ₹4 |
| 4 | WTP: -
Operation, guarding of clear water Pump 3 nos. (2W + 1S) each of 110 KW Back wash pumping machineries 25 KW , Dewatering water pumps, L.T. PDB panel cum MCC panels of individual Soft starter panels, Pump Control Panel, along with other accessories and electrical gadgets, actuator operated butterfly valves, flow meters, level indicators etc an inside the WTP pumping station and internal and external illumination complete with all other electrical accessories and ancilliaries indoor Sub-Station for Transformer 11/0.433. KV (2 x 800KVA) for operation and guarding of Substation equipment’s for round the clock supply of drinking water by engaging 4(Four) nos operating personnel as per direction of E.I.C. (Including Bonus, EPF ESI) | 365 | /Day | 3 | ₹1,095 |
| 5 | GASEOUS CHLORINATION PLANT AT CLEAR WATER Operation & guarding of gaseous chlorination system two(2) Set installed at site for feeding chlorine gas in the drinking water for disinfection of the same by engaging 2(Two) nos operating personnel as per direction of E.I.C
(by Dep’t.supplied Chlorine Gas )(Including Bonus, EPF ESI) | 365 | /Day | 4 | ₹1,460 |
| 6 | Supervision charges for Gas Plant by Gas Plant Supervision and the cost of visit charges of the Gas Plant Supervisor at least two day in a month along with expart technician for servision of the installation for the above period as per direction of E.I.C | 12 | /Month | 5 | ₹60 |
| 7 | Routine & Periodical inspection by electrical supervisor having
valid suprevisor's certificate of competency from directorate of Electricity (Licensing board), Govt. of West Bengal or under any other State Government of India along with Pump Technician / Supervisor for checking of Pumping station, Sub-Station D.G Set, L.T and H.T equipments PDB panel, MCC/ Starter panels for all pumping machineries, indoor & out door lighting , valves with actuators along with all other electro mechanical installation e.g. level indicator, flow meter to keep the system in healthy condition.
N.B-Minimum 2 day in a month and each visit should be recorded in the log book (with date and time) to be supplied by the agency and kept in the pump house building . | 12 | /Month | 7 | ₹84 |
| 8 | Testing and calibrationand different relays, breakers, for smooth operation of x 800 KVA Sub-Station by any testing Agency approved by WBSEDCL or Directorate of Electricity Board as per direction of E.I.C. ( preferable in the internalval of 6 months)
[Payment to be made only after submiting of nesessary report] | 2 | L.S | 8 | ₹16 |
| 9 | Cost of refilling of 900kg empty cylenders from authorised liquid chlorine refilling station including charges of testing of cylenders, transpotation etc all complete as per technical Specifications given in NIT | 12 | L.S | 9 | ₹108 |
| 10 | Annual internet data maintanace charges of 33(thirty three) nos SIM and cable internet cannection and cloud charges as per direction of E.I.C | 1 | L.S | 10 | ₹10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendernotice_2.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 6.13 MB
BOQ_2534323.xls
BOQ • 0.34 MB
Specification_substation.pdf
Tender Documents • 1.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .