Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-Finance | L1 | Accepted-Finance LOWEST FIRST | |
| 2 | L2₹5.4 L+₹4,094.96 (0.76%)Accepted-Finance | L2 | Accepted-Finance LOWEST SECOND | |
| 3 | L3₹5.4 L+₹4,859.35 (0.90%)Accepted-Finance | L3 | Accepted-Finance LOWEST THIRD |
Tender Value
₹5.5 L
EMD Value
₹54,599
Closing Date
22 Jun 2026, 5:00 pmClosed
EO NAGAR PALIKA PARISHAD DHAMPUR
NAGAR PALIKA PARISHAD DHAMPUR
Plantation of trees at various places in Nagar Palika Parishad Dhampur Bijnor and construction of tree guards for protection of trees
2026_DOLBU_1160202_1
RAJYA VITT/BOARD FUND/2025-26
Open Tender
Civil Works
Percentage
30 days
NAGAR PALIKA PARISHAD DHAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹645
EO NPP DHAMPUR
₹54,599
4 Jul 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Excavation in foundation by manual means in ordinary soil ( Loam, clay or sand) including lift up to 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 M from the foundation trenches. As per S.I. No. 251. | 2.7 | cum | 200 | ₹540 |
| 1.02 | Providing and fixing galvanised M.S wire gauge to windows and clerestory windows using galvanised M.S wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63mm. | 168 | sqm | 850 | ₹1,42,800 |
| 1.03 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1200 Sr. No. 11.7. | 18.4 | qtl | 8,120 | ₹1,49,408 |
| 1.04 | Cement Concrete with 2 cm. guage approved stone ballast coarse sand and cement in proportion of 1:2:4 including supply of all material, labour and T&P etc.required for proper completion of work. As per S.I. No. 279a. | 1.35 | cum | 7,600 | ₹10,260 |
| 2Laying and Jointing PVC Pipe. Heading | |||||
| 2.01 | Applying primer coat over new steel and other metal surface after paint including preparing the surface by throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes fine steen/wood scrappers sand paparing and knotting including coat of all and supply of all material, labour and T&P etc.required for proper completion of work (Superior quality). Chap-15 New item la+2+3(iii) | 1,791 | sqm | 78 | ₹1,39,698 |
| 2.02 | Cost of establishment of Trees. | 100 | Nos | 200 | ₹20,000 |
| 3 | IN GST 18% | 1 | Nos | 83,288 | ₹83,288 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_2174380.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .