Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹10.8 L
Closing Date
25 Sept 2026, 12:00 pm3d left
SE Ayo-Amb Circle PWD Ayodhya
Office of the SE Ayo-Amb Circle PWD Ayodhya
Construction work of 04 No Type-4 pooled housing units for officers at headquarters Akbarpur in Ambedkarnagar district
2026_CEUFZ_1186924_1
5766/1Bhawan Ayo-Amb.Circl/2026 Date 08-09-2026
Open Tender
Civil Works - Buildings
Fixed-rate
360 days
Ambedkar Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹10.8 L
Yes
Office of the SE Ayo-Amb Circle PWD Ayodhya
17 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 482 | CUM | 180 | ₹86,760 |
| 2 | In all kind of soil upto 1.5m to 3.0m. depth | 147 | Cum | 268 | ₹39,396 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 63 | CUM | 1,469 | ₹92,547 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ,including cost of form- work,in foundation and floors. | 72 | CUM | 4,712 | ₹3,39,264 |
| 5 | Making apron(with Drain & other )analysis | 134 | Rm | 853 | ₹1,14,302 |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floorWith Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 425 | SQM | 214 | ₹90,950 |
| 7 | As in item No.8 above but in R.C.C. Raft foundation and footing with approved stone ballast. (Using 1:1.5:3 Mix concrete) | 139 | CUM | 6,257 | ₹8,69,723 |
| 8 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3,(1cement :1.5corse sand 3 grit) in Lintel excluding supply of reinforcement and its fixing and bending but including its fixing and binding the same necessary with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. | 188 | CUM | 7,959 | ₹14,96,292 |
| 9 | As in item above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20. | 43 | CUM | 7,507 | ₹3,22,801 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in .foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 25.5 | CUM | 4,934 | ₹1,25,817 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
Tendernotice_2.pdf
PDF • 0.82 MB
BOQ_2234534.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .