Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹6.5 LAdmitted-Finance | ₹6.5 L | L2 | Admitted-Finance |
| 3 | L3₹6.9 LAdmitted-Finance | ₹6.9 L | L3 | Admitted-Finance |
| 4 | L4₹7.1 LAdmitted-Finance | ₹7.1 L | L4 | Admitted-Finance |
| 5 | L5₹7.4 LAdmitted-Finance | ₹7.4 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHAN CONSTRUCTIONS L3 | SOFI MUBASHER HUSSAIN L1 | M/S N.M.CONSTRUCTIONS L2 | WAQAR AHMAD SHAH L5 | FAYAZ AHMAD DAR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth upto 25m Lead. | 48.18 | cum | 200 ₹9,636 | 100 ₹4,818 | 311 ₹14,983.98 | 150 ₹7,227 | 301 ₹14,502.18 |
| 2.00 | Providing and laying stone soling in the excavated trenches, duly hand packed on level including ramming with iron hand rammers, including loading, unloading and carriage. | 9.6 | cum | 900 ₹8,640 | 1,400 ₹13,440 | 1,100 ₹10,560 | 900 ₹8,640 | 1,100 ₹10,560 |
| 3.00 | Providing and laying in position cement concreate of specified grade (1:4:8) excluding the cost of centring and shuttering. | 9.6 | cum | 4,500 ₹43,200 | 2,400 ₹23,040 | 3,911 ₹37,545.60 | 4,000 ₹38,400 | 2,900 ₹27,840 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundation | 248.9 | sqm | 100 ₹24,890 | 70 ₹17,423 | 249 ₹61,976.10 | 250 ₹62,225 | 350 ₹87,115 |
| 5.00 | Providing and laying in position cement concrete of specified grade (1:2:4) excluding the cost of centring and shuttering | 39.47 | cum | 7,000 ₹2.8 L | 4,500 ₹1.8 L | 5,311 ₹2.1 L | 6,100 ₹2.4 L | 6,000 ₹2.4 L |
| 6.00 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Riveted and bolted )and applying priming coat of approved steel primar (all Complete) | 1,920 | Kg | 100 ₹1.9 L | 100 ₹1.9 L | 91 ₹1.7 L | 120 ₹2.3 L | 99 ₹1.9 L |
| 7.00 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.
Made of G.I. wire of dia 4 mm 16 and applying a priming coat of an approved steel primer. | 195 | sqm | 700 ₹1.4 L | 610 ₹1.2 L | 711 ₹1.4 L | 800 ₹1.6 L | 712 ₹1.4 L |
| 8.00NOTE: ALL WORKS SHALL BE CARRIED OUT STRICTLY AS PER REC STANDARDS WITH LATEST AMENDMENTS THERE OF. | ||||||||
Tender Value
₹8.1 L
EMD Value
₹16,206
Closing Date
24 Jan 2026, 4:30 pmClosed
Executive Engineer, STD-II, Rajbagh,Srinagar
Office of the Executive Engineer, STD-II, Rajbagh
Providing of chain link fencing for Reciving Station Kanir.
2026_PDD_299690_1
eNIT No STD-II / 60 of 2025-26 Dated 02-01-2026
Open Tender
Civil Works
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer, STD-II, Rajbagh,Srinagar
₹16,206
Yes
18 Feb 2026
3 Jan 2026
27 Jan 2026
3 Jan 2026
24 Jan 2026
3 Jan 2026
Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth upto 25m Lead.
Providing and laying stone soling in the excavated trenches, duly hand packed on level including ramming with iron hand rammers, including loading, unloading and carriage.
Providing and laying in position cement concreate of specified grade (1:4:8) excluding the cost of centring and shuttering.
Centering and shuttering including strutting, propping etc. and removal of form work for Foundation
Providing and laying in position cement concrete of specified grade (1:2:4) excluding the cost of centring and shuttering
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Riveted and bolted )and applying priming coat of approved steel primar (all Complete)
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia 4 mm 16 and applying a priming coat of an approved steel primer.
NOTE: ALL WORKS SHALL BE CARRIED OUT STRICTLY AS PER REC STANDARDS WITH LATEST AMENDMENTS THERE OF.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.60 MB
BOQ_972363.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid