Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC 2723 ADARSH NAGAR NAYAGAON MOHALI | ₹4.4 L | 1 | Accepted-AOC L1 FIRM |
| 2 | 2₹4.6 L+₹20,582.42 (4.72%)Rejected-Finance | ₹4.6 L+₹20,582.42 (4.72%) | 2 | Rejected-Finance L2 FIRM |
Tender Value
₹5.2 L
EMD Value
₹10,395
Closing Date
3 Jul 2026, 11:00 amClosed
Executive Engineer
Sector 11B, Chandigarh
Providing of 02 Nos. New Water Cooler with R.O Facility Administrative Block at General Manager and Main Gate of Workshop Depot III, Sector 25, Chandigarh.
2026_CHD_93582_1
PH7/2026/07
Open Tender
Public Health Products
Percentage
30 days
Chandigarh
Please refer to tender docs
2 documents required · 2 mandatory
₹0
₹10,395
4 Aug 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work up to plinth level : | - | - | - | - |
| 2 | 1:2:4 (1cement :2coarse sand :4graded stone aggregate 20mm nominal size) | 1.5 | Cum | 7,665.78 | ₹11,498.67 |
| 3 | 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size) | 1 | Cum | 6,342.6 | ₹6,342.6 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to ings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and forcement, with 1:2:4 (1cement : 2coarse sand 4graded stone aggregate 20 mm nominal size). | 0.5 | Cum | 11,194.95 | ₹5,597.48 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :. | - | - | - | - |
| 6 | Suspended floors, roofs, landings, balconies and access platform | 5 | Sqm | 902.21 | ₹4,511.05 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.. | - | - | - | - |
| 8 | Cold twisted bars. | 55 | Kg | 104.94 | ₹5,771.7 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | - | - | - | - |
| 10 | Cement mortar 1:4 (1 cement : 4 coarse sand). | 1.5 | Cum | 7,171.64 | ₹10,757.46 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.87 MB
BOQ_114634.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .