Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.4 LAccepted-AOC RH NO 06 KARMA KSHETRA HOUSING SOCIETY SECTOR 29 PRADHIKARAN RAVET POST DEHU ROAD 412 101 | NA | NA | 412101 | L1 | Accepted-AOC The lowest bonafide e-tenderer | |
| 2 | -₹64.7 LRejected-Finance BLOCK NO 306 A CHAUDHARY CHOWK JARIPATKA NAGPUR 440014 | NAGPUR | NAGPUR | MAHARASHTRA | 440014 | - | Rejected-Finance Not the lowest e-tenderer | |
| 3 | -₹66.7 LRejected-Finance MEGHA SADAN GAGANNAGAR CURTI PONDA GOA 403401 | PONDA | SOUTH GOA | GOA | 403401 | - | Rejected-Finance Not the lowest e-tenderer | |
| 4 | Rejected-Technical H NO 190 S 4 CHODANKAR RESIDENCY NEAR GANPATI TEMPLE CENTRAL HORTA AQUEM BAIXO NAVELIM SALCETE GOA 403707 | SOUTH GOA | GOA | 403707 | - | Rejected-Technical Not Meeting Eligibility Criteria. |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
22 Apr 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COL SANTOSH PANDEY CWE(ARMY) MUMBAI
Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
MANNING AND OPERATION OF WATER SUPPLY AND SEWAGE INSTALLATION AND COMPREHENSIVE SEWAGE INSTALLATION AND COMPREHENSIVE MAINTENANCE OF SWIMMING POOL UNDER GE PANAJI
2021_MES_433765_1
84024/P/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE PANAJI GOA
PLEASE REFER THE TENDER DOCUMENTS
7 documents required · 7 mandatory
₹1,000
GE PANAJI GOA
₹1.5 L
13 May 2021
31 Mar 2021
23 Apr 2021
31 Mar 2021
22 Apr 2021
10 Apr 2021
31 Mar 2021 - 15 Apr 2021
60 days
Amount
PART-I Providing services for manning and operation of Water supply installations and Diesel engine Generating sets of any capacity including Sunday and Holiday located at Bambolim Area (Pump house No-1 & II) in 2 shifts per day by deploying 01 Fitter Genaral Mechanic (FGM) for each shift (Each shift of 08 Hrs in continious durations) including manning and operation of connected item such as 04 Nos of centrifugal pumping sets of any capacity up to 40 HP, sluice valves of any size up to 200 mm dia, Gate valves, suction, delivery and priming pipe line, distribution line with in the premises of pump house including connected electrical items such as MCCB's/MCB's, Starters, Voltmeter & Ammeter etc in pump house LT panel board/Feeder box, control copper cables and chlorination of water etc complete including maintaining all doccuments as specified, cleaning, removing of vegetations, cutting of bushes etc and maintaining hygenic with in the premises of Pump house, liasioning with PWD and maintaining of associated electrical devices complete all as specified and as directed by Engr-in-Charge. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs ; 2nd Shift - 1400 Hrs to 2200 Hrs Notes : Notes are applicable for Item No 01-09 (i) The contractor shall pay to his employees in their Bank Account and statement of Bank Account shall be submitted to GE for his verification while claiming interim payment. (ii) The rates quoted shall be deemed to be inclusive of latest notification issued by Govt of India/ State govt/Local body which ever is higher as on bid submission end date. The minimum wages, all taxes (including GST, GST on works contracts, labour welfare cess/tax etc.), EPF for personals employed and also any other levies payable under the respective statutes. The contractor shall be required to submit the documentary proof of Employers Provident Fund(EPF) details for the personals employed. (iv) The rate quoted below minimum wages shall not be considered for acceptance. (v) The bidder shall have to be consider their profit and over head charges on above provision. In case bidder consider NIL profit and over head charges, the bidder shall be treated as a unresponsive and his offer shall be consider as a non bonafide bid. (vi) In case the overall quoted rates are less than minimum wages including saturatory provisions mentioned above, such quotde bid shall be consider as non-bonafide bidder and the same shall not be considered for acceptance.
Providing services for Manning and Operation of pump sets of sewage Treatment plant of capacity 1.0 MLD and connected sewage pumps houses - 04 Nos located in Bambolim camp (01 No at DCP Colony, 01 No near MDC, 01 No at Md JCO's/OR's Accn 5 TTR and 01 No at Offr's Md Accn Bambolim) including M & O of DG sets of capacity 160 KVA at STP Plant & 100 KVA at 3 TTR Sub station in Two shifts per day by providing One Fitter General Mechanic (FGM) per shift ( Ist & IInd shifts), each shift of eight hour continue duration including maintenance and operation of connected items such as submersible Raw sewage pumps 08 Nos (02 Nos in each pump house) in Bambolim camp area and STP Plant consisting of submersible Raw Sewage Pumps - 02 Nos, submersible Sewage Transfer Pumps - 03 Nos, Agetator motor and assembly, Blowers - 02 Nos, all chemical dozing pumps, Chlorination plant, sludge Transfer pumps - 02 Nos, Centrifuse, etc all connected sewage transfer pipe line and connected to suction and delivery of the sewage pump sets, electrical items such as main switches, star delta/DOL starter, Voltmeter, Ammeters etc in the panel board at sewage treatment plant including maintennce of all connected doccuments all as specified and directe by Engineer-in-Charge. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs ; 2nd Shift - 1400 Hrs to 2200 Hrs.
Providing services for Manning and Operation of pump sets of sewage Treatment plant of capacity 1.0 MLD and connected sewage pumps houses - 04 Nos located in Bambolim camp (01 No at DCP Colony, 01 No near MDC, 01 No at Md JCO's/OR's Accn 5 TTR and 01 No at Offr's Md Accn Bambolim) including M & O of DG sets of capacity 160 KVA at STP Plant & 100 KVA at 3 TTR Sub station in Two shifts per day by providing One Mate FGM in Ist & IInd shifts, each shift of eight hour continue duration including maintenance and operation of connected items such as submersible Raw sewage pumps 08 Nos (02 Nos in each pump house) in Bambolim camp area and STP Plant consisting of submersible Raw Sewage Pumps - 02 Nos, submersible Sewage Transfer Pumps - 03 Nos, Agetator motor and assembly, Blowers - 02 Nos, all chemical dozing pumps, Chlorination plant, sludge Transfer pumps - 02 Nos, Centrifuse, etc all connected sewage transfer pipe line and connected to suction and delivery of the sewage pump sets, electrical items such as main switches, star delta/DOL starter, Voltmeter, Ammeters etc in the panel board at sewage treatment plant including maintennce of all connected doccuments all as specified and directe by Engineer-in-Charge. I. Total Shifts (a) Mate FGM - 02 Shifts/ Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs ; 2nd Shift - 1400 Hrs to 2200 Hrs.
Providing services for manning and operation of Water supply disribution system including Sunday and Holiday at over head reservoir of 80,000 Glns capacity 3 TTR, 1,25,000 Glns capacity at 5 TTR location in Bambolim camp Area in 1 shifts per day by deploying 01 Valve man in each location in Ist Shift of 08 Hrs continious duration including manning and operation of connected item such as sluice valves of any capacity with in the premises of OH reservoir, water pressure gauges, Water level indicator, maintenance of valve chambers etc complete including maintaining all doccuments as specified, cleaning, removing of vegetations, cutting of bushes etc and maintaining hygenic with in the premises, liasioning with Pump operator to ensure proper pumping and maintaining of associated electrical devices complete all as specified and as directed by Engr-in-Charge. I. Total Shifts (a) Valve Man - 02 Location x 01 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs
All as per Item No 01 here in before but for Margao Pump House Area (Pump House No- I & II) complete all as specified and as directed. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs; 2nd Shift - 1400 Hrs to 2200 Hrs
All as per Item No 01 here in before but for ASC Supply and booster pump house at ASC supply depot, Margao by deploying One FGM in one shift each complete all as specified and as directed. I. Total Shifts (a) FGM - 01 Shifts/Day X 30 Days X 11 Months = 330 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs / 2nd Shift - 1400 Hrs to 2200 Hrs
All as per Item No 01 here in before but for ASC Supply and booster pump house at ASC supply depot, Margao by deploying One valve man in one shift each complete all as specified and as directed. I. Total Shifts (a) Valve Man - 01 Shift/Day X 30 Days X 11 Months = 330 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs / 2nd Shift - 1400 Hrs to 2200 Hrs
All as per Item No 01 here in before but for Ponda Pump House Area (Pump House No-I & II) by deploying Two FGMs in each shift complete all as specified and as directed. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs; 2nd Shift - 1400 Hrs to 2200 Hrs.
All as per Item No 01 here in before but for Ponda Pump House Area (Pump House No-I & II) by deploying One Valve man in General shift complete all as specified and as directed. I. Total Shifts (a) Valve man - 01 Shift/Day X 30 days X 11 Months = 330 Shifts II. Shift Timings General - 0900 Hrs to 1700 Hrs
Providing services for Maning and Operation of pump sets connected to the Main Pump house and swimming pool at Altinho Area by providing one Fitter General Mechanic (FGM) in Two shifts per day by deploying 01 FGM in each shift (Each shift of 08 hour continious duration) consisting of 02 Nos Centrifugal pump sets in pump house, 03 Nos of pump sets (02 Nos functioning at a time ) including operation of filtration plant, connected valves, electrical items such as main switches,star delta/DOL starter, Voltmeter, Ammeters etc in the panel board and adding requierd quantity of chemicals in swimming pool and regular water supply in total area all as specified and directed by Engineer-in-Charge. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs; 2nd Shift - 1400 Hrs to 2200 Hrs. NOTES APPLICABLE TO ITEM NO 07 & 08 (a) Cleaning of swimming pool bottom with suction sweeper including side walls and steel ladders with nylon wire brush at Margao all as specified and directed by Engineer-in-Charge. (b) Suction sweeper will be provided and maintained by the contractor. Contractor has to provide large size brushes and other requierd equipment all as directed. (c) Repair to suction float valves, minor repair to suction sweeper's flanges, bolts and nuts,clamp washers, painting etc shall be provided by the contractor as and when requierd without any extra cost to the department. (d) The rate quoted shall be deemed to include the charges for divers for cleaning the side wall of the swimming pool once every month and for maintaining clean and sterile water to the satisfaction of Engineer-in-Charge
Providing services for Maning and Operation of pump sets connected to the swimming pool at Margao by providing one Filter General Mechanic (FGM) in One shift per day by deploying 01 FGM in each shift (Each shift of 08 hour continious duration) consisting 03 Nos of pump sets (02 Nos functioning at a time ) including operation of filtration plant, connected valves, electrical items such as main switches,star delta/DOL starter, Voltmeter, Ammeters etc in the panel board and adding requierd quantity of chemicals in Swimming Pool all as specified and directed by Engineer-in-Charge. I. Total Shifts (a) FGM - 01 Shifts/Day X 30 Days X 11 Months = 330 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs
Providing services for Manning and Operation of pump sets of sewage pump installations in two shifts per day by providing one Filter General Mechanic (FGM) per each shift of eight hour duration including maintenance and operation of connected items such as sluice valve/Gate valve connected to suction and delivery of the sewage pump sets, rising main and electrical items such as main switches,star delta/DOL starter, Voltmeter, Ammeters etc in the panel board at sewage pump house No 1 & 2 at Margao consisting of non clogging type sewage pump sets 04 Nos and 2 Nos respectively all as specified and directed by Engineer-in-Charge. I. Total Shifts (a) FGM - 02 Shifts/Day X 30 Days X 11 Months = 660 Shifts II. Shift Timings 1st Shift - 0600 Hrs to 1400 Hrs; 2nd Shift - 1400 Hrs to 2200 Hrs The quoted rate is deemed to be included for the following: (a) Providing Gland packing, rubber packings, Lubrication materials, Bolts, Nuts, washers, rubber seal packings etc required for the routine maintenance work by the contractor (b) Safety equipments and stritched uniform blue in colour will be supplied to the trades man free of cost by the contractor. (c) Breakdown if any/Restoration will be monitories /operated as directed by Engr-in-Charge or his representative in the station. (d) The operator shall be responsible for supplying of un-interupted water supply from the above mentioned pump houses to the users at Bambolim, Panaji, Madgao, Ponda and Altinho area and maintaining hygenic in pump house, complete all as directed by Engr-in-Charge. (e) The break down register /Log book indicating the failure of supply with justifying reason shall be maintained by the contractor and the same will be checked periodically by the Engr-in-charge or his representative. Weekly off shall be given to the employed staff and alternate arrangement shall be made by the contractor at no cost to the Govt. (f) The rate quoted shall be deemed to include the cost of surface cleaning up to 5 Mtr from external perimeter of installation by cutting shrubs, vegetation, grass, bushes, beads and tress up to 30 CM girth, sweeping and removing the same to a distance not exceeding 50 M away from the installations surrounding area, premises of the pump house. (g) for cutting shrubs, vegetations, grass, bushes and trees necessary tools or T & P shall be provided by the contractor at his own arrangement. (h) The operator will also responsible for ON/OFF the unit security light feeder with in given time period as directed by Engr-in-charge or his representative for the safe custody of the installation. (j) The quoted rate is deemed to be inclussive of necessary safety tools and general Tools for attending day to day complaints and Breakdown compliants and spl T & P required at site etc complete and no extra payment will be allowed in this regard. (k) Log sheets/books for all the complaints to be provided by the contractor and maintained by the operator. Weekly OFF shall be given to the employed staff and alternate arrangement shall be made by the contractor and no extra cost (l) Net protection to sewage water well & swimming pool will be provided by contractor to avoid outside dust into the pump. (m) The Operator shall be responsible for adding chemicals and releasing water from the above mentioned pump house to the users at Margao and Ponda areas and maintaining clean and sterile water at the swimming pool at Margaon area all as directed by Engineer-in-Charge.
PART - II SUPPLY ITEMS Cleaning of swimming pool bottom with suction sweeper including side walls and steel ladders with nylon wire brush at Margao all as specified and directed by Engineer-in-Charge.
Surface cleaning by cutting/trimming shrubs, vegetation, grass, bushes, weeds and tree up to 30 CM grith, weeping and removing the same to a distance not exceeding 5 Mtr along the sides of installations complete all as specified and as directed. Note: Area beyond 5 Mtr of external perimeter of installation shall only be measured and paid under this item.
Supply and add the chemicals to fresh water and swimming pool water to maintain water quality and protection from fungi and bacteria at Margao & Altinho (i) Alum Ferric compound of approved quyality
Supply and add the chemicals to fresh water and swimming pool water to maintain water quality and protection from fungi and bacteria at Margao & Altinho (i) Copper Sulphate
Supply and add the chemicals to fresh water and swimming pool water to maintain water quality and protection from fungi and bacteria at Margao & Altinho (a ) Calcium Hypochlorited 65% to 75% available chlorine ums contain appropriate quantities of dispersant/corrosion inhibitors to prevent encrustation/scaling in distribution system Make : AQUAFIT of Shree Royalseema Hi-Strength Hypo Ltd. NOTES APPLICABLE FOR ITEM NO 7 & 8 (i) The above chemicals shall be added in the swimming pool water on requierd basis depending upon the quality of water as directed by the Engineer-in-Cgarge or his representative. (ii) Prior approval shall be obtained before adding the chemicals and also with respect to the quality of chemicals (iii) Chlorine test kit will be provided by the contractor and test results will be entered in the register on daily basis. (iv) Purchase voucher for all items above shall be produced by the contractor to Engineer-in-Charge.
M A Builders
M/s Hari Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .