| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance KULLANDI STREET M PALLIPATTI POST METTUR TALUK SALEM DISTRICT 636 458 | METTUR | SALEM | TAMIL NADU | 636458 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 107 ASHOK NAGAR GANDHI NAGAR POST NEYVELI 607 308 | NEYVELI | CUDDALORE | TAMIL NADU | 607308 | Admitted-Finance |
| 5 | Admitted-Finance NOCHIPALAYAM AUTHUR PO KARUR 2 | Admitted-Finance |
Tender Value
₹35.8 L
EMD Value
₹35,800
Closing Date
12 Aug 2020, 2:00 pmClosed
SE GCC CBE
182,DR.SUBBARAYAN STREET, TATABAD, COIMBATORE DT - 641 012.
22/2020-20 of SE GCC CBE
2020_EB_174057_1
22/2020-20 of SE GCC CBE
Open Tender
Civil Works
Item Wise
90 days
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹35,800
Yes
26 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
12 Aug 2020
30 Jul 2020
Amount
Earth work excavation for foundation in HGS and and depositing on bank with initial lead of 10 m and initial lift of 2 m in Hard stiff clay Stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per standard Specification as directed by the Engineer at site.
Earth work excavating for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting as per standard Specification as directed by the Engineer at site.
Earth work excavation for Foundation in Hard rock by Wedging and Chiseling and trimming to proper shape where blasting is prohibited and stacking for measurements including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site.
Filling the foundation and floor with M Sand including cost of sand, filling charges as per standard specification(watering & consolidation with all leads and lifts etc., complete.
Plain cement concrete in CC 1:3:6, using 20mm HBG metal, including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
PCC 1:2:4 mix using 20mm HB stone machine crushed metal for plinth including cost of all labour, materials, lead, lift, curing, etc., complete.
Providing form box for various size plinths above ground level including cost of steel strutting with cost of all materials,labour , lead, lift etc., complete as per standard specifications as directed by the Engineer in charge at site.
Labour charges for assembling of various plinth template for providing concrete, including transporting from one plinth to another aligning fixing to correct level and dismantling the template after concrete, including cost of Labour lead, lift, etc., complete, as per standard specification.
Supplying and Fabrication of 20mm dia sizes of M.S grouting bolt including cutting, bending, threading 100 mm length including galvanizaion and providing 2 nos. nuts with washer etc and fixing them in plinth including cost of material, Labour lead, lift, etc., complete, as per standard specification.
Supplying and Fabrication of 25mm dia sizes of M.S grouting bolt including cutting, bending, threading 100 mm length with galvanized and providing 2 nos. nuts with washer etc and fixing them in plinth including cost of material, Labour lead, lift, etc., complete, as per standard specification.
Re-Filling with Excavated Earth in Plinth foundation including cost of all Labour, lead, lfit etc., complete.
Disposal of surplus earth away in low lying area with a lead of 100 Mts including spreading and levelling labour, lead, lift as per standard specification, etc., complete.
Brick work in C.M 1:5 using chamber burnt class II bricks, for Breaker approach steps & Cable duct including, cost of cement, all materials, labour, curing, all leads and lifts, etc complete as per Standard Specification.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for Cable duct raft & Bkr including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for CABLE DUCT COVER SLAB including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of formwork as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Reinforced Cement concrete in C.C. 1:1½:3 mix, using 12 to 20mm HBG machine crushed metal for CULVERT SLAB including cost of cement, all materials, labour, curing, all leads and lofts vibrating charges including cost of shuttering as per standard specification, etc., complete. but excluding cost of steel reinforcement.
Providing steel reinforcement MS/RTS rods for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Plastering with CM 1:3, 12mm thick, including cost of cement, labour, curing, all leads and lifts as per standard specification, etc., complete.
Colour washing with two coats of cement paint of approved quality based on the one coat of white cement including thorough scrapping, clean removal of dirt, cost of all materials, Labour, Lead, Lift etc., complete and including necessary crack filling paste, putty whereever required.
Supply & Fixing of GI angle of size 45x45x6mm to required length subject to a average length of 0.9m keeping in required alignment and level in yard cable duct fixing at 600mm C/c including cost of angle, galvanisation, labour for fixing lead, lift etc., complete.
Labour charges for Transporting of all cable duct cover slab from curing to duct keeping them alignment and fixing them in position including lead, lift, labour etc., complete.
Supplying and fixing of approved quality of MS Rails (90 LBS) for transformer plinth including proper alignment and interconnecting the two rails with flat on both ends by welding including labour, lead, lift etc. complete, as per standard specification.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Sp Constructions
M/s.Vetriconstructions
K.SELVARAJ
C.PERIYASAMY
S RATHIKA CONSTRUCTIONS
JERALIN JERISH
ASAITHAMBI.M
MSS CONTRACTORS
Thulasingam
P.V.CONSTRUCTIONS
JK ENGINEERS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .