Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹10,350
Closing Date
7 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Const /imp of link road from kalandar Mir to Ab Rashid Mir onwards at Matipora
2026_RDPR_318002_14
NIT NO 79 OF 2026-27 ADF GEN TARATHPORA
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹10,350
27 Jul 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
27 Jul 2026 - 27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6mix (1 Cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) crushed stone aggregates including dewatering if any and head load | 15.37 | Cum | 5,733.6 | ₹88,125.43 |
| 2 | Earthwork in excavation by manual means in trenches for foundation ,drains ,etc (not exceeding 1.5m in width )and the like not exceeding 10sqm on plan,including dressing of sides and ramming of bottomd lift upto 1.5m ,including getting out excavated earth and disposal of surplus excavated earth as directed :All kinds of soil including dewatering if any | 7.5 | Cum | 479.3 | ₹3,594.75 |
| 3 | P/L of nallah muck /soling incl.levelling,watering,consolidation with road roller with 8-10tonne with all carraige upto site of work a nd head load if any | 222.59 | Cum | 950 | ₹2,11,460.5 |
| 4 | Centering and shuttering for Foundations, footings, bases of columns etc. for mass concrete including of same . | 54 | Sqm | 286.35 | ₹15,462.9 |
| 5 | P/L of RCC spun pipes 300mm dia including earthwork cutting with all carraige upto site of work | 15 | rm | 1,200 | ₹18,000 |
| 6 | Carraige of crushed stone agg. for an avg. lead of 10 Kms by MT | 13.83 | cum | 279 | ₹3,858.57 |
| 7 | sand for an avg.lead of 20kms by MT | 6.92 | cum | 409.94 | ₹2,836.78 |
| 8 | P/F of signboard and photograph | 1 | no | 1,500 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1045408.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .