| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.0 LAdmitted-Finance | -31.18% | ₹68.0 L | L1 | Admitted-Finance |
| 2 | L2₹73.5 LAdmitted-Finance | -25.66% | ₹73.5 L | L2 | Admitted-Finance |
| 3 | L3₹75.2 LAdmitted-Finance | -23.99% | ₹75.2 L | L3 | Admitted-Finance |
| 4 | L4₹75.8 LAdmitted-Finance | -23.29% | ₹75.8 L | L4 | Admitted-Finance |
| 5 | L5₹76.0 LAdmitted-Finance | -23.11% | ₹76.0 L | L5 | Admitted-Finance |
Tender Value
₹99 L
EMD Value
₹2.0 L
Closing Date
18 Mar 2026, 6:00 pmClosed
Executive Engineer PWD Division Jalore
Executive Engineer PWD Division Jalore
Damaged CD works on Bhawarani Khandap VR
2026_CEPWD_546012_1
Short Term NIT NO 27/2025-26 EE PWD Division Jalore
Open Tender
Civil Works
90 days
Jalore
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
EXECUTIVE ENGINEER PWD DN JALORE/MD RISL JAIPUR
₹2.0 L
Yes
23 Mar 2026
14 Mar 2026
19 Mar 2026
14 Mar 2026
18 Mar 2026
14 Mar 2026
Part 'A' (Road Work ) Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3
Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.By Mechanical Means with all lead
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately)
Part 'B' CD WORK Excavation for Structures Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15 Nominal mix (1:2.5:5)
Stone masonry work in cement mortar in foundation complete as per drawing and MoRTH specifications Clauses 1402, 1405, 2102 & 2104. Random Rubble Masonry,In 1:3 cement mortar
Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and MoRTH specification Clauses 1313, 1411 and 2206.6 50 mm thick
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.300 mm dia
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905. 750 mm dia.
Part 'C' Road Furniture Work Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge.
Supply & Fixing of flood gauge (water Gauge) as per I.R.C. 67 standard 200 cm long fixed on angle iron posts 50x50x6 mm, 2.6 M. long.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.71 MB
Tendernotice_2.pdf
PDF • 2.37 MB
Tendernotice_3.pdf
PDF • 17.46 MB
Tendernotice_4.pdf
PDF • 1.76 MB
BOQ_973775.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid