Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.1 L+₹1,192.50 (0.39%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C KUMARAN L2 | RAJENDRAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Repair for Panchayat union Elementary school East side for Principal room in Kayavayal village in Kalipuli Panchayat | |||||
| 2.00 | chipping the concrete and roughing the surface including all labour charges etc | 2.1 | M2 | 9 ₹18.9 | 8 ₹16.8 Lowest |
| 3.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 0.9 | M2 | 275 ₹247.5 | 272 ₹244.8 Lowest |
| 4.00 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 1.2 | M2 | 315 ₹378 | 312 ₹374.4 Lowest |
| 5.00 | Finishing with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm (40% New ) | 44.73 | M2 | 1,092 ₹48,845.16 | 1,090 ₹48,755.7 Lowest |
| 6.00 | White washing two coats, including cost and conveyance all materials and scaffolding charges etc., complete | 55.67 | M2 | 38 ₹2,115.46 | 36.5 ₹2,031.96 Lowest |
| 7.00 | Oil bound Distempering painting with two coats, Using Oil bound Distemper including cost and conveyance all materials and scaffolding charges etc., complete | 85.86 | M2 | 69 ₹5,924.34 | 68.5 ₹5,881.41 Lowest |
| 8.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping,clean removal of dirt. The rate includers cost of brushes sand papper,plaster of parries, putty wherever required and neat finishing etc.complete complying with standard specification and as directed etc | 100.77 | M2 | 255 ₹25,696.35 | 253.5 ₹25,545.2 Lowest |
| 9.00 | Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 15.84 | M2 | 147 ₹2,328.48 | 145 ₹2,296.8 Lowest |
| 10.00Repair to School building for Panchayat union Elementary school south side in Kayavayal village in Kalipuli Panchayat | |||||
Tender Value
₹4.0 L
EMD Value
₹4,040
Closing Date
9 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development officer (BP)
Block Development officer (BP) UNION OFFICE,KALLAL
RepairsPUEschool Principle Room and South side Building at Kayavayal Village in Kalipuli Panchayat
2025_RDTN_576519_1
RepairsPUEschoolKalipuliP8
Open Tender
Civil Works
Item Rate
UNION OFFICE, KALLAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,040
9 Sept 2025
1 Jul 2025
9 Jul 2025
1 Jul 2025
9 Jul 2025
1 Jul 2025
Amount
Repair for Panchayat union Elementary school East side for Principal room in Kayavayal village in Kalipuli Panchayat
chipping the concrete and roughing the surface including all labour charges etc
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Finishing with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm (40% New )
White washing two coats, including cost and conveyance all materials and scaffolding charges etc., complete
Oil bound Distempering painting with two coats, Using Oil bound Distemper including cost and conveyance all materials and scaffolding charges etc., complete
Re Painting the walls with Two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping,clean removal of dirt. The rate includers cost of brushes sand papper,plaster of parries, putty wherever required and neat finishing etc.complete complying with standard specification and as directed etc
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Repair to School building for Panchayat union Elementary school south side in Kayavayal village in Kalipuli Panchayat
chipping the concrete and roughing the surface including all labour charges etc
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Finishing with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm (40% New )
White washing two coats, including cost and conveyance all materials and scaffolding charges etc., complete
Oil bound Distempering painting with two coats, Using Oil bound Distemper including cost and conveyance all materials and scaffolding charges etc., complete
Re Painting the walls with Two coats with first class quality Plastic Emulsion Paint of approved colour over a priming coat including through scraping,clean removal of dirt. The rate includers cost of brushes sand papper,plaster of parries, putty wherever required and neat finishing etc.complete complying with standard specification and as directed etc
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Painting two coats with approved Black Oxide for Old Black board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
C KUMARAN (BID ID -1396161)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_688916.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .