Executive Officer, Balimela NAC
Executive Officer, Balimela NAC
Construction of Approach RCC Road with RCC Drain for the newly constructed CHC Building ward No-10 at Balimela NAC
2026_ORULB_140860_3
EOBLM/01/2026-27
Open Tender
Civil Works - Others
Percentage
Balimela
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹49,144
Yes
11 Sept 2026
11 Sept 2026
30 Sept 2026
11 Sept 2026
29 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in hard soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre lift and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. | 412.73 | Cum | 282.89 | ₹1,16,757.19 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty of all materials labour, T&P, etc. complete. | 125.97 | Cum | 738.69 | ₹93,052.78 |
| 3 | P.C.C.(1:3:6) using 40 mm size H.G. metal well rammed with cost, conveyance, royalty, taxes of all materials and all labour, T&P, etc. complete. | 116.97 | Cum | 6,074.5 | ₹7,10,534.27 |
| 4 | R.C.C.work of M-20 grade with 20 mm and down grade size C.B H G. Chips well rammed with cost, conveyance, royalty, taxes of all materials and all labour, T&P, etc. complete. Column Base | 187.5 | Cum | 5,917.42 | ₹11,09,516.25 |
| 5 | R.C.C.work of M-20 grade with 20 mm and down grade size C.B H G. Chips well rammed with cost, conveyance, royalty, taxes of all materials and all labour, T&P, etc. complete. Column Base | 47.27 | Cum | 8,445.79 | ₹3,99,232.49 |
| 6 | Labour for laying sub-base in layers not exceding 100mm watering and compacting to the required desity in O.M.C with PRR but excluding cost and conveyance of Sub-base materils | 575.1 | Cum | 1,044.44 | ₹6,00,657.44 |
| 7 | Providing and laying of Granular SUB-Base by Providing Coarse Graded Materils with Wet Mix, Grade IV and Spreading in unifroms Layers with Motor grade on preparaed surface, Mixing by mix in place Method with rotovator at OMCand Compacting and rolling with smooth wheeled, vibratory and tandem rollers to achive the desired compaction etc completd (Ref. A/R page | 231.25 | Cum | 2,776.59 | ₹6,42,086.44 |
| 8 | Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets | 15 | Rmt | 7,854.4 | ₹1,17,816 |
| 9 | Supplying fitting & Placing uncoated HYSD bar rainforcement complete as per technical specification including cost of approved TOR Steel etc. | 99.75 | Qntl | 9,274.06 | ₹9,25,087.49 |
| 10 | Rigid, smooth centering and shuttering for R.C.C.work with false work and dismentling after casting including cost of all meterials. | 737.22 | Sqm | 249.8 | ₹1,84,157.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.59 MB
BOQ_609391.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .