Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.6 LAccepted-Finance | ₹67.6 L | L1 | Accepted-Finance Being L1 accepted |
| 2 | L2₹74.3 L+₹6.8 L (10.0%)Rejected-Finance | ₹74.3 L+₹6.8 L (10.0%) | L2 | Rejected-Finance Being L2 rejected |
Tender Value
₹84.5 L
EMD Value
₹1.7 L
Closing Date
27 Jul 2026, 3:00 pmClosed
Executive Engineer WD XXII
WD XXII PWD Fatorda
Supplying, Installation, Testing and Commissioning Air Conditioning of Auditorium hall of New Extension Block at Govt. Polytechnic Cacora, Curchorem-Goa. (Call no.4)
2026_PWD_30285_1
3/26-27/PWD/WDXXII/MnE/ ASW/TN-13/01 dtd.13.07.2026
Open Tender
Electrical Works
Percentage
365 days
Curchorem
Please refer Tender Notice TN-13 dtd 13.07.2026
6 documents required · 6 mandatory
₹10,000
Yes
₹1.7 L
Yes
14 Aug 2026
13 Jul 2026
29 Jul 2026
14 Jul 2026
27 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply, installation, testing, positioning, commissioning & handling over of DX Type Custom built ceiling mounted AHU of make Daikin, Carrier and Bluestar with 50 mm thick puff panel with 0.6mm inner & outer sheet. It shall have Drain pump, it shallhave Merve 8 & 13 Filter | |||||
| 1.01 | a)11 TR Ductable Unit.b) 4400CFM. | - | Nos | 6,05,000 | - |
| 2 | Refrigerant Piping Interconnecting copper refrigerant pipe work duly insulated with elastomeric nitile rubber type tubular insulation between indoor & outdoor units as per approved shop drawing and technical specifications.12.7-with 13 m nitrile rubber insulation & 28.6 - with 19m thick nitrile rubber insulation - For 11.0 TR Ductable Unit | - | Mtr | 5,100 | - |
| 3Supply and installation of AHU Connection Kt. | |||||
| 3.01 | 52 TR (11TR + 11TR + 11 TR + 11TR) | - | Set | 42,500 | - |
| 4Supply and installation of Condensated drain piping (PVC) with 6/9mm thick Nitrile Rubber installation | |||||
| 4.01 | 50 mm- 9mm insulation | - | RM | 770 | - |
| 5Air Side SITC of Factory Fabricated Ducts | |||||
| 5.01 | 24 G | - | Sqmt | 2,700 | - |
| 5.02 | 22 G | - | Sqmt | 3,000 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.89 MB
Tendernotice_2.pdf
PDF • 0.85 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.21 MB
Tendernotice_5.pdf
PDF • 0.47 MB
Tendernotice_6.pdf
PDF • 0.19 MB
BOQ_30701.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .