| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | ₹14.8 L | L1 | Accepted-Finance Being a lone agency accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Similar AHU works not enclosed |
Tender Value
₹14.3 L
EMD Value
₹28,540
Closing Date
4 May 2026, 3:00 pmClosed
Executive Engineer WD XXII
WD XXII PWD Fatorda
Repair and mainteinance of 16 nos. of Air Handling Unit (AHU) of ZECO AIRCON LIMITED MAKE and installation of heating coils /humidifier at sub district Hospital Ponda Goa.(Call no.5)
2026_PWD_28863_1
3/26-27/PWD/WDXXII/MnE/ ASW/TN-05/01 dtd.23.04.2026
Open Tender
Electrical Works
Percentage
365 days
Ponda
Please refer Tender Notice TN-05 dtd 23.04.2026
6 documents required · 6 mandatory
₹5,000
Yes
₹28,540
Yes
29 May 2026
23 Apr 2026
5 May 2026
24 Apr 2026
4 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair & maintainance of Air Handling Unit at operation Theatre No:-1 Model no:-ZDS-20 AIR QUANTITY :- 2000 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 300MM-4 Nos.Box type filters. 2)Final Filter Replacement :610mm X 610mm X 300mm-1 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing.6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls .10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clean, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 2 | Repair & Maintainance of Air Handling Unit at operation Theatre No:-2 Model no:-ZDS-20 AIR QUANTITY :- 2000 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 300MM-4 Nos.Box type filter. 2)Final Filter Replacement :610mm X 610mm X 300mm-1 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair:Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing. 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls.10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clean, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 3 | Repair & Maintainance of Air Handling Unit at operation Theatre No:-3 Model no:-ZDS-20 (serial no-Not visible) AIR QUANTITY :- 2000 CFM Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 300MM-4 Nos.Box type filter. 2)Final Filter Replacement :610mm X 610mm X 300mm-1 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair:Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing. 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage.11)Sensors:Maintenance of Reurn Air,Outdoor waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clea, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair.17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 4 | Repair & Maintainance of Air Handling Unit at operation Theatre No:-4 Model no:-ZDS-20 AIR QUANTITY :- 2000 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 300MM-4 Nos.Box type filters. 2)Final Filter Replacement :610mm X 610mm X 300mm-1 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clean, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | job | - | - |
| 5 | Repair and maintainance of Air Handling Unit at office no.1 Model no:-ZDS-100 AIR QUANTITY :- 9600 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 50MM-4 Nos.Box type filters. 2)Final Filter Replacement :600mm X 300mm X 300mm-2 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clean, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | job | - | - |
| 6 | Repair and maintainance of Air Handling Unit at office no. 2 Model no:-ZDS-25 (serial no-Not visible) AIR QUANTITY :- 7200 CFM Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 50MM-4 Nos.Box type filters. 2)Final Filter Replacement :600mm X 600mm X300mm-4 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls.10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-29 V Belts-2 nos. 14)Strainer:Inspection,Clean, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 7 | Repair and maintainance of Air Handling Unit at OPD no. 14 Model no:-ZDS-100 AIR QUANTITY :- 4400 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 50MM-1 Nos. ,600mm X 300MM X 50MM-1 Nos, 300mm X 300MM X 50MM-1 NosBox type filters. 2)Final Filter Replacement :600mm X 600mm X 300mm ,-1 nos. , 600mm X 250mm X 300mm ,-2 nos Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-39 V Belts-2 nos. 14)Strainer:Inspection,Clea, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 8 | Repair & Maintenance of Air Handling Unit at OPD no.19 Model no:-ZDS-50 AIR QUANTITY :- 4400 CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 50MM-2 Nos.Box type filters. 2)Final Filter Replacement :600mm X 600mm X 300mm-2 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls.10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-29 V Belts-2 nos. 14)Strainer:Inspection,Clea, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 9 | Repair & Maintenance of Air Handling Unit at OPD no.25 Model no:-ZDS-50 AIR QUANTITY :- 2400 CFM (sr.no.1013512-1 Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 300MM X 50MM-1 Nos, . 600mm X 600MM X 50MM-1 Nos.Box type filters. 2)Final Filter Replacement :600mm X 600mm X 300mm-2 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-29 V Belts-2 nos. 14)Strainer:Inspection,Clea, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
| 10 | Repair and maintainance of Air Handling Unit at X-Ray Room Model no:-ZDS-25 AIR QUANTITY :- 7200CFM (serial no-Not visible) Work Addresses following components:- 1)Pre-Filter Replacement :600mm X 600MM X 50MM-4 Nos.Box type filters. 2)Final Filter Replacement :600mm X 600mm X 300mm-4 nos. Flange type filters. 3)Return Air Damper & Outside Air Damper Repair Inspecting and repairing issues with the return air damper and outside air damper. 4)Cooling Coil :Inspecting ,Cleaning and repairing 5)Supply fans :Checking for wear ,lubricating and repairing. 6)Moisture Eliminators :Replace. 7)Sound Attenuator:Inspect and Repairing. 8)Exhaust Return Fan: checking proper operation. 9)Lubricating moving parts,tighten connections,and calibrating controls. 10)Actuator:Inspect and address any damage. 11)Sensors:Maintenance of Reurn Air,Outdoor Air waterflow,Airflow,supply Air Sensors. 12)Electric Motors: Maintenance of Fans,Belts and bearings. 13)Changing of Belts:-A-29 V Belts-2 nos. 14)Strainer:Inspection,Clea, and repair. 15)Valves:Inspect,Repair & change. 16)Electric Connections & Switches:Check for proper operation and repair. 17)Heating Coil/Humidfier:Installation of Heating Coils/Humidifier:Installation of Heating coils/Humidifier in AHU for proper functioning at the climate of Goa region. | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 0.82 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.21 MB
BOQ_29299.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .