Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | L1 | Accepted-AOC Accepted due to lowest rates | |
| 2 | L2₹2.5 L+₹9,573.70 (4.00%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹2.6 L+₹17,933.40 (7.50%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹2.6 L+₹24,430 (10.2%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹2.7 L+₹30,739 (12.9%)Rejected-Finance CHENAB VALLEY DIVISION HPPWD UDAIPUR HIMACHAL PRADESH | CHAMBA | HIMACHAL PRADESH | 176207 | L5 | Rejected-Finance Rejected |
Tender Value
₹1.9 L
EMD Value
₹3,800
Closing Date
24 Apr 2021, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Construction of Retaining wall for protection of Tree near R T O in ward No 11
2021_MC_46284_9
1082Dated30032021
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer Tender Documents
6 documents required · 6 mandatory
₹350
Executive Engineer R B M C Shimla
₹3,800
28 Jul 2021
7 Apr 2021
26 Apr 2021
7 Apr 2021
24 Apr 2021
7 Apr 2021
Amount
Cutting in earth work in all kinds of soil including spade work, pick work, jumper work and blasting work and disposal of excavated earth up to all leads and lifts as directed by Engineer-in-Charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Excavation in earth work in all kinds of earth work including spade work, pick work, jumper work, B/work chiseling wedging out of rock etc. up to all lifts in earth work including dressing of sides and bed and disposing of excavated earth to be leveled and neatly dressed as directed by the Engineer-in-charge. (Disposal of earth/muck in MC dumping site at Bharyal free of cost, transportation charges will be paid extra)
Providing and laying cement concrete 1:6:12 (1 cement: 6 sand: 12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of centring and shuttering in Foundation and plinth
Providing from work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden battens and ballies, height of propping and centring below supporting floor to ceiling upto all heights and removal of the same for insitu-reinforced concrete & plain concrete work in Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like
Providing and laying cement concrete 1:5:10 (1 Cement: 5 Sand: 10 graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining walls/Breast walls, the size of plums shall usually be 150mm to 300mm as per HPPWD specification
P/L 100 mm dia PVC pipe for weep holes
Stone filling behind retaining walls :
BILAL AHMED BUTT
bharat singh
ABDUL RAZAK BUTT
LALIT KUMAR
MANMOHAN SHARMA
Kuldeep Sharma
SATISH KUMAR JAGTA
himesh
SUNIL SHARMA
INDER JEET
GULAM MOHIDEEN MIR
PARTAP CHAND SAKLANI
VINAY MANDHOTRA
BALDEV SINGH THAKUR
DINESH
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .