Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹41.6 LAccepted-AOC MU PO NAIK PLOT KANDLI PARTAWADA TA ACHALPUR DIST AMRAVATI MAHARASHTRA | ACHALPUR | AMRAVATI | MAHARASHTRA | ₹41.6 L Quoted ₹25.4 L | L-1 | Accepted-AOC Aoc Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
13 Mar 2026, 5:00 pmClosed
District WC Officer ZPMI Division Amravati
District WC Officer ZPMI Division Amravati
REPAIRS OF MINOR IRRIGATION TANK AT BARU TQ. DHARNI DIST- AMRAVATI
2026_AMRAV_1284267_1
EE/AMT/ZP/MI/TEN/403/11/25-26
Open Tender
Civil Works
Percentage
180 days
AT BARU TQ. DHARNI DIST- AMRAVATI
REPAIRS OF MINOR IRRIGATION TANK AT BARU TQ. DHARNI DIST- AMRAVATI
4 documents required · 4 mandatory
₹2,360
₹47,000
17 Apr 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No :- 1 Cleaning grass and removal of rubbish upto a distance of 50 m outside the periphery of the area as directed by the Engineer -In-Charge | 4,035.63 | Sqm | 4.67 | ₹18,846.39 |
| 2 | Item No 2:-Excavation in All Kind of Soil including boulders upto 0.6 m diameter for canel, seating of embakment, filter belt, catch water drains etc and placing the excavated stuff neatly in dump area or for the formation of the service road / embakment including cost of all materials, mechinery , labour , dressing bed and sides to required level and profile etc complete wtih lead below and all lifts as directed by Engineer In Charge | 1,738.49 | Cum | 42 | ₹73,016.58 |
| 3 | Item No 3:- Excavation in Hard Rock of all toughness by breaker including boulders above 0.6 m dia.(0.113Cum) minimising damage to side slopes of excavation in water prism area by adopting any one or combination of line drilling / pre-splitting / smooth blasting techniques and placing the excavated rock neatly in approved dump areaincluding cost of all materials, mechinery , labour , dressing bed and sides to required level and profile etc complete wtih lead below and all lifts as directed by Engineer In Charge | 55 | Cum | 608.66 | ₹33,476.3 |
| 4 | Item No :- 4 Dismentaling Dry Rubble Stone Pitching including stacking the material with 15 m lead and all lifts etc complete as dirercted by Engineer In Charge | 1,110.94 | Cum | 180.66 | ₹2,00,702.42 |
| 5 | Item No 5:- Providing and laying in situ cement concrete of grade M-15 of trap / granite / gneiss / quartzite /graded metal for PCC with or without surface reinforcement /PCC concereting requiring heavy or special type of shuttering for work of gallery , sluice , spilway crest spilway downstream face energy dissipating structures, intake structures, reining walls, piers abutments etc with concrete mixer with shuttering and scaffolding , placing compacting curring with an initial lead of 1 km and with all lifts as by Eingineer In Charge | 12 | Cum | 6,348.03 | ₹76,176.36 |
| 6 | Item No 6:- Providing and Fixing TMT -FE -500 bar rainforcement of various diameter for RCC Work, pipe, caps, footing, foundation, slab beam, column, canopies, stair case , chhaja, lintels, copings, as per detail drawing and schedule, including cutting, bending, hooking, binding with wire, tack welding and supporting as required as per standard specification with all leads & lifts etc complete as directed by the Engineer-In Charge | 0.3 | MT | 85,291.15 | ₹25,587.34 |
| 7 | Item No 7:- Providing Harting Embackment using selected Impervious Soil from approved borrow area (Government acquired land ) in layers including cost of all material, machinery labour all other operations such as collection of soil, spreading soil in layers of specific thickness sorting out breaking clods leveling edges / sides watering compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc complete with all lead and lifts as directed by Engineer -In-Charge | 1,243.13 | Cum | 196.54 | ₹2,44,324.77 |
| 8 | Item No 8:- Providing Casing Embackment using selected Impervious Soil from approved borrow area (Government acquired land ) in layers including cost of all material, machinery labour all other operations such as collection of soil, spreading soil in layers of specific thickness sorting out breaking clods leveling edges / sides watering compacting each layer to density control of not less than 95 percent or as stipulated using vibratory compactor etc complete with all lead and lifts as directed by Engineer -In-Charge | 1,851.12 | Cum | 480.45 | ₹8,89,370.6 |
| 9 | Item No 9- Providing and Constructing 230 mm thick dry rubbles stone pitching using stones and stone chips from approved source from borrow area including cost of all material , labour ,hand packing / wedging stone chips , finishing etc complete with lead upto 50m and all lifts as directed by Engineer in Charge | 762.83 | Cum | 217.13 | ₹1,65,633.28 |
| 10 | Construction Head Regulator Item No :- 10 Dismentaling The Stone Masonry in Cement Mortor including stacking the material with all lifts etc complete as dirercted by Engineer In Charge | 32.78 | Cum | 253.92 | ₹8,323.5 |
stage.html
html • 0.04 MB
technical_2208598.pdf
techsummary_2208598.pdf
finance_2208598.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.07 MB
APPENDIXSBA.pdf
Other Document • 0.61 MB
4MITANK-BARU_TENDER_BOOKLETpdf.pdf
Tender Documents • 2.70 MB
BOQ_2208598.xls
BOQ • 0.30 MB
4PartBBaru.pdf
Additional Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .