Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical SCO 108 SECTOR 47C CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160047 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 70 INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA 134113 | PANCHKULA | PANCHKULA | HARYANA | 134113 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹81.9 L
Closing Date
24 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Punjab Water Supply and Sewerage Division Gurdaspur
Providing laying cutting testnig of Sewer RCC Np 3 with HDPE lining and Rising main D I K 9 pipe cont M H Chamber Hatch box MPS and Survey Design Supply and Soil Testing Const Inst Comm of 20 MLD STP cum 60 KLD FSTP including O and M Gurdaspur
2026_DLG_176692_1
08 of 2026-2027
Open Tender
Civil Works
Lump-sum
548 days
Gurdaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹81.9 L
Yes
Gurdaspur
25 Nov 2026
1 Oct 2026
25 Nov 2026
1 Oct 2026
24 Nov 2026
1 Oct 2026
9 Oct 2026
120 days
Providing, Laying, Jointing, Cutting, Testing of Sewer R.C.C. NP-3 with HDPE lining & Rising Main D.I. K-9 Pipe Line & Construction of Manhole Chamber, Hatch Box, Main Pumping Station
TOTAL AMOUNT
Part B
Survey, Design, Supply & Soil Testing Construction, Installation, Commissioning of 20.00 MLD Sewerage Treatment Plant Cum (60.0 KLD) FSTP respectively based on any suitable sustainable & proven biological technology works including O & M sixty months only for STP & FSTP after stabilization period of 3 months or more at Town & Distt. Gurdaspur. (SBM 2.0 Scheme).
Credit of sludge
Net Amount
Total Average Daily Guaranteed Power Consumption in KVAH (for STP)
Technology Offered
* Mandatory to fill in the power requirement under the column of quantity.
G-TOTAL AMOUNT (Part A +Part B)
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Sbm2VolumeI.pdf
Tender Documents • 14.56 MB
Sbm2VolumeII.pdf
Tender Documents • 23.20 MB
pricebids.xls
Additional Documents • 0.07 MB
Sbm2VolumeIII.pdf
Tender Documents • 15.15 MB
Finalplan.pdf
PDF • 8.55 MB
T08datedextended2ndtime.pdf
PDF • 0.68 MB
AddendumNo1uploadeproc.pdf
PDF • 1.14 MB
T08dateextended.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .