| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹5.2 L+₹28,581.05 (5.76%)Rejected-Finance P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L2 | Rejected-Finance Second lowest bidder | |
| 3 | L3₹5.5 L+₹57,399.80 (11.6%)Rejected-Finance V P O BARI GUMANUTEH SADAR DISTRICT MANDI H P | L3 | Rejected-Finance Third lowest bidder | |
| 4 | L4₹5.5 L+₹58,178.39 (11.7%)Rejected-Finance | L4 | Rejected-Finance Fourth lowest bidder | |
| 5 | L5₹5.9 L+₹95,328.39 (19.2%)Rejected-Finance GOVT CONTRACTOR VPO DHASOLI TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L5 | Rejected-Finance Fifth lowest bidder |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
31 Jul 2023, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
(SH- Construction of retaining wall for protection of building).
2023_SIDC_76453_1
Job No. 8
Open Tender
Civil Works
Item Rate
30 days
Una
Please refer Tender documents.
9 documents required · 9 mandatory
₹700
₹11,000
27 Sept 2023
21 Jul 2023
1 Aug 2023
21 Jul 2023
31 Jul 2023
21 Jul 2023
Amount
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with in all leads and lifts including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all teads and lifts, dressing of sides and bottom and backfilling in trenches with excavated suitable material Ordinary rock (not requiring blasting)including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing and Laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 1:4:8 (1Cement :4 Sand : 8 greded stone aggregate 20 mm size) including cost of form work and carriage of material within all leads and lifts and as per direction of engineer-in-charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe 4.50 Kg/Sqm. extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 ( 1 cement :3 Sand :6 graded crushed stone aggregate 20 mm nominal size) including cost of form work and including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix (1:2:4) ( 1 cement :2 Sand :4 graded crushed stone aggregate 20 mm nominal size) including cost of form work and including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Excavation in earth work and filling in 15 cm. layers in foundation and plinths including ramming, watering and consolidating including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.
Providing mild steel/tor steel reinforcement for reinforced cement concrete work including bending, binding and placing in position complete in all floor levels (a). Tor steel. including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.. Make Sail, Tata and Jindal
Lath Electrical and Construction Works
Mahesh Kumar
Maynak Sharma
Sushil Kumar
Ravinder Singh Govt Contractor
Ajay Kumar Bassi
unique engg. solutions
Kapil Rana
Abhay Singh Rana
VIKAS SHARMA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .