Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31,400Accepted-Finance | ₹31,400 | L1 | Accepted-Finance Price bid approved |
| 2 | L2₹32,400Accepted-Finance | ₹32,400 | L2 | Accepted-Finance Price bid approved |
| Sl No | Description | Qty | Unit | SUDHARSAN ENTERPRISES L1 | SARASWATHY ENGINEERING AND CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling lifting and leading the Polishing unit from 4.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position. | 1 | Opn | 6,700 ₹7,906 | 7,000 ₹8,260 |
| 2.00 | Draining the old resins from the polishing unit & filling with new resins after completion of treatment with mixture bed in the D.M plant. This works include providing hoses for inlet & out let of polishing unit.(Stator water polishing unit) | 1 | Opn | 5,700 ₹6,726 | 6,000 ₹7,080 |
| 3.00 | Changing of all gaskets in the pipe lines of the polishing unit (Stator water polishing unit). | 1 | Opn | 3,500 ₹4,130 | 3,700 ₹4,366 |
| 4.00 | Charges of assisting for re-generation process/chemical treatment.(Stator water polishing unit) | 1 | Opn | 15,500 ₹18,290 | 15,700 ₹18,526 |
Tender Value
Refer Docs
Closing Date
12 Feb 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES Circle EM I Regeneration of polishing unit of Stator Water System in Unit I during Capital Overhauling for the year 2025 2026
2026_EB_648128_1
CE/SE/ES/TTPS/No.209/2025-26
Open Tender
Electrical and Maintenance Works
40 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
Yes
19 Feb 2026
28 Jan 2026
13 Feb 2026
28 Jan 2026
12 Feb 2026
28 Jan 2026
Charges for dismantling lifting and leading the Polishing unit from 4.5mtr. area to DM Plant for regeneration of the resin, Dismantling of outlet flanges, Cleaning of the mesh and reassembling with new gaskets, and back to its original position.
Draining the old resins from the polishing unit & filling with new resins after completion of treatment with mixture bed in the D.M plant. This works include providing hoses for inlet & out let of polishing unit.(Stator water polishing unit)
Changing of all gaskets in the pipe lines of the polishing unit (Stator water polishing unit).
Charges of assisting for re-generation process/chemical treatment.(Stator water polishing unit)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_777027.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid