Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 5 107 D1 MEENAKSHI NAGAR 4 STREET A SALAIPUDUR KOVILPATTI 628 502 | KOVILPATTI | TIRUNELVELI | TAMIL NADU | 628502 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 1 250 Y KODIKULAM KODIKULAM POST MADURAI 625 104 | MADURAI | MADURAI | TAMIL NADU | 625104 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance D NO 50 41 ALAGAR NAGAR 5TH STREET K PUDUR MADURAI 625007 | MADURAI | MADURAI | TAMIL NADU | 625007 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
4 Apr 2022, 2:00 pmClosed
The Chief Engineer,
The Chief Engineer, Transmission Projects II, Periyamilaguparai, Near Collectorate, Trichy - 1.
Providing Circular pile foundation, Transporting and stub setting for Loc.14,15 ,16 at Vaigai River Crossing for erection of 110 KV SC line on DC towers from Manamadurai 110 KV SS to a common point Loc.A for the proposed Manamadurai Traction SS
2022_EB_226362_1
CE TP-II TRY C-43 2021-22
Open Tender
Civil Works
Works
90 days
Manamadurai
As per Tender Specification
4 documents required · 4 mandatory
₹0
₹1.4 L
Yes
5 Apr 2022
18 Mar 2022
5 Apr 2022
18 Mar 2022
4 Apr 2022
18 Mar 2022
Amount
Line works
Clearing juliflora jungle with uprooting including all cost of labour ,lead ,lift etc., complete
Supplying, collection and stacking, spreading of gravel for approach road including cost and conveyance of gravel and all labour charges lead, lift etc., complete.
Levelling the site for forming approach road by using earth mooving equipment including lead, lift etc., complete.
Forming coffer dam for divertion of water with sand bags during the construction of pile foundation including cost of all materials labour, lead, lift etc., complete.
Conduting Check survey, marking for tower pile foundation loc as per the approved profile including cost all materils ,T&P ,Transport ,labour ,lead ,lift etc complete
Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete.
Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after comletion of pilling works etc., complete.
Supplying, fabrication of 4 mm M.S. sheet for making into circular casing shape to the required dia including welding, placing in position and driving into bore hole including cost of all materilas and MS plate, all labour charges etc., complete.for 600mm dia pile
Boring and concreting of vertical reinforced concrete pile 600 mm dia upto required depth from tip of the in all clauses of soil using pile augurs for boring using Bentonite slurry and filling the bore with RCC M25 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.50 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement).
Chipping and dismantling of pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
Earthwork excavation in sand or other loose soil not under water, silt, black cotton soil, sandy loom, ordinary soil etc., and depositing the same on bank within initial lead and lift etc., complete.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete.
Dewatering using 3/5 HP diesel engine during excavation and concreting including fuel and other chares, lead and lift etc., complete.
PCC 1:3:6 using 20 mm HBG metal for base course for Pile cap without formwork including cost and conveyance of all materials, labour, lead, lift etc., complete.
RCC M25 using 12 to 20 mm HBG metal for pile cap and for Tie beam with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lft etc., complete but excluding cost of steel reinforcement.
RCC M25 using 12 to 20 mm HBG metal for Piers for tower legs with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lft etc., complete but excluding cost of steel reinforcement.
Providing pipe type earthing including necessary drilling for fixing 6m long 50mm dia GI "B" class pipe and refilling with excavated earth mixed with soft charcoal and connect the 50x6mm flat with the leg of the stub by welding including all cost of materials lead lift etc complete.( Earth pipe and flat will be supplied by the contractor)
Supply, cutting and bending the steel rods of required size and length as per the instruction of Engineer incharge, including tying and placing to the correct alignment and level as per drawing including cost and conveyance of all materials, lead, lift etc., complete.(Steel reinforcement for RCC works)
Supply,fabrication and Labour charges for fixing of 25mm GI rod with MS flat of size 60x6mm for anchorage fixed in the pier vertically @ 30cm c/c to the required length for ladder purpose in correct position including labour ,cutting etc., complete as per the drawing and std.specification
PCC 1:2:4 using 12 to 20 mm HBG metal for the protection arrangements around the pile cap and Tie beam with steel form work as per drawing including cost and coneyance of all materials, lead, lift etc., complete. Excluding cost of steel reinforcement during flood.
Providing two legged scafolding using 15cm diameter blue-gum posts or casurina posts of best quality bamboo posts of 4m overall length(3m height+0.5m projection +0.5 m into the ground)the distance betweeen the two rows being 1.25m and the spacing of the post being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces @ 2m c/cincluding longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width,etc., in a complete form using coir and nails-1m run
Transport and fixing of KCR stub and cleat using levelling instrument with supply of template and assembling at site and shifting the template from loc to loc including cost of all materials for template ,labour, fabrication charges etc complete.
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
M.NATARAJAN
S.KUMARAPANDIAN
BOSE AND CO
stage.html
html • 0.02 MB
finance_267409.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .