Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | ₹6.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹7.1 L+₹60,055.19 (9.28%)Rejected-AOC | ₹7.1 L+₹60,055.19 (9.28%) | L2 | Rejected-AOC Reject |
| 3 | L3₹7.9 L+₹1.4 L (22.2%)Rejected-AOC | ₹7.9 L+₹1.4 L (22.2%) | L3 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
11 Jun 2026, 3:00 pmClosed
Zonal Officer II
New Zonal office building, Kamarajar Salai, Chennai - 600068
IMPROVEMENT WORK FOR BAILING UNIT AT WINDROW PRIMISES ROAD IN DIVISION-22, UNIT-5, ZONE-2.
2026_CoC_678677_1
Z.O.II.C.No.E1/722077/2026
Open Tender
Civil Works
Works
90 days
Manali
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,500
28 Jul 2026
29 May 2026
12 Jun 2026
29 May 2026
11 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all kinds soils in varying depths including dismantling any masonry or roots BD-121 | 11 | CUM | 368.55 | ₹4,054.05 |
| 2 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officer BDDATA-126 | 4 | CUM | 391.95 | ₹1,567.8 |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed s...least 1 metre height)-Mixing by mechanical means BDDATA-137 | 4 | CUM | 6,916.1 | ₹27,664.4 |
| 4 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION BDDATA-147 | 48 | CUM | 756.34 | ₹36,304.32 |
| 5 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level BDDATA-168b | 648 | CUM | 98.7 | ₹63,957.6 |
| 6 | Providing and laying in position, standardised con...the Department for the excess usage of materials). BDDATA-163 | 6 | CUM | 8,015.86 | ₹48,095.16 |
| 7 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3 BDDATA-196c | 28 | CUM | 8,192.9 | ₹2,29,401.2 |
| 8 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) BDDATA-296 | 240 | CUM | 317.59 | ₹76,221.6 |
| 9 | Roofing with Galvanised corrugated iron sheet of thickness 0.8mm BDDATA-351 | 120 | CUM | 1,079.12 | ₹1,29,494.4 |
| 10 | Painting new iron works such as steel doors...ed by the Executive Engineer before use on works.) BDDATA-368 | 111 | CUM | 165.54 | ₹18,374.94 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
722077.pdf
Tender Documents • 1.56 MB
BOQ_815363.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .