| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹11.1 L (4.67%)Admitted-Finance | ₹2.5 Cr+₹11.1 L (4.67%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹33.7 L (14.1%)Admitted-Finance | ₹2.7 Cr+₹33.7 L (14.1%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 Cr+₹55.9 L (23.5%)Admitted-Finance | ₹2.9 Cr+₹55.9 L (23.5%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 Cr+₹96.4 L (40.5%)Admitted-Finance | ₹3.3 Cr+₹96.4 L (40.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.K GUPTA AND CO. L4 | ALHADIN CONSTRUCTION L3 | V&A Ventures LLP L5 | ASHOK KUMAR GARG CONTRACTOR L2 | Cee Kay EPC Projects Pvt Ltd L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Material Required | ||||||||
| 1.10 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Kms. | 1,100 | Nos | 9,300 ₹1,02,30,000 | 10,500 ₹1,15,50,000 | 11,029 ₹1,21,31,900 | 10,000 ₹1,10,00,000 | 9,000 ₹99,00,000 Lowest |
| 1.20 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Kms. | 275 | Nos | 11,500 ₹31,62,500 | 11,500 ₹31,62,500 | 12,887 ₹35,43,925 | 12,000 ₹33,00,000 | 11,000 ₹30,25,000 Lowest |
| 1.30 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 138 | Nos | 4,500 ₹6,21,000 | 2,000 ₹2,76,000 Lowest | 2,231 ₹3,07,878 | 2,500 ₹3,45,000 | 2,000 ₹2,76,000 Lowest |
| 1.40 | Formed OFC Dead End and Termination Fittings including all supporting items.(@ 7/Km) | 550 | Nos | 2,100 ₹11,55,000 | 1,800 ₹9,90,000 | 2,738 ₹15,05,900 | 1,800 ₹9,90,000 | 1,200 ₹6,60,000 Lowest |
| 1.50 | OFC suspension fittings including all supporting items.(@ 18/Km) | 825 | Nos | 1,750 ₹14,43,750 | 1,600 ₹13,20,000 | 2,113 ₹17,43,225 | 1,800 ₹14,85,000 | 850 ₹7,01,250 Lowest |
| 1.60 | Adjustable Cable Storage Bracket.(@ 5/Km) | 275 | Nos | 1,150 ₹3,16,250 | 1,800 ₹4,95,000 | 1,113 ₹3,06,075 | 1,000 ₹2,75,000 | 550 ₹1,51,250 Lowest |
| 2.00Services Required | ||||||||
| 2.10 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of- Way (RoW) permission and sign writing on poles with paint (detailed at note 1 below) | 1,375 | Nos | 6,300 ₹86,62,500 | 4,200 ₹57,75,000 Lowest | 5,575 ₹76,65,625 | 4,900 ₹67,37,500 | 4,800 ₹66,00,000 |
| 2.20 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes including cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 55 | Km | 60,000 ₹33,00,000 | 45,000 ₹24,75,000 | 66,509 ₹36,57,995 | 90 ₹4,950 Lowest | 42,000 ₹23,10,000 |
Tender Value
Refer Docs
EMD Value
₹7.5 L
Closing Date
12 Nov 2024, 2:00 pmClosed
DGM(HQ-P)
KIDWAI BHAWAN NEW DELHI
Comprehensive Contruction of ADSS OF Cable in Shimla BA for 55 Km
2024_BSNL_212201_1
CNNCO-17/11/161/2024-P AND M/T-24 Dated 22.10.2024
Open Tender
OFC Laying Works
Works
365 days
KIDWAI BHAWAN NEW DELHI
As per Tender Document
2 documents required · 2 mandatory
₹2,360
Yes
AO (Cash) HQ BSNL NTR
₹7.5 L
Yes
30 Dec 2024
22 Oct 2024
13 Nov 2024
22 Oct 2024
12 Nov 2024
22 Oct 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material Required | |||||
| 1.1 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF @ 20 per Kms. | 1,100 | Nos | 100 | ₹1,10,000 |
| 1.2 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @ 5 per Kms. | 275 | Nos | 100 | ₹27,500 |
| 1.3 | Stay arrangement for 7M/8M steel poles of Galvanised Steel | 138 | Nos | 10 | ₹1,380 |
| 1.4 | Formed OFC Dead End and Termination Fittings including all supporting items.(@ 7/Km) | 550 | Nos | 10 | ₹5,500 |
| 1.5 | OFC suspension fittings including all supporting items.(@ 18/Km) | 825 | Nos | 10 | ₹8,250 |
| 1.6 | Adjustable Cable Storage Bracket.(@ 5/Km) | 275 | Nos | 10 | ₹2,750 |
| 2Services Required | |||||
| 2.1 | Erection of 7 m / 8m poles including excavation, fixing of MUFF, concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of- Way (RoW) permission and sign writing on poles with paint (detailed at note 1 below) | 1,375 | Nos | 10 | ₹13,750 |
| 2.2 | Slinging / Laying of ADSS / AOF including fixing of installation accessories and fixtures etc. Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes including cost towards collection of ADSS Cable / AOF Cable from BSNL’s Store Depot. | 55 | Km | 10 | ₹550 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.26 MB
Tenderdocument.pdf
Tender Documents • 6.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .