| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical 158 H 2 OM PRAKASH NAGAR RAJURUPUR PRAYAGRAJ | Accepted-Technical ok |
| 3 | Not Admitted-Fee/PreQual/Technical MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹49,000
Closing Date
1 Dec 2025, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow Superintending Engineer, E.C.T.C. Lucknow
Civil Works Regarding 33 KV ITC Bay at 132/33 Sub Station Sandila Hardoi
2025_UPCTL_1093535_1
70/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
60 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Superintending Engineer, E.C.T.C. Lucknow
₹49,000
7 Jan 2026
24 Nov 2025
2 Dec 2025
24 Nov 2025
1 Dec 2025
24 Nov 2025
Points
Meter
Same in NSI item-23 above but for auxiliary structure. (labour rate only).
Total Rs.(Without GST)
1.All civil work shall be executed according to the approved drawings of UPPTCL.
Terms & Conditions:
2.The quantities are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
3.All civil work shall be carried out as per UPPWD/UPPTCL specification.
4.Rates in BOQ are exclusive of CGST,SGST.Labour tax shall be borne by contractor.
6.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
7.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
5.Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used.
8.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat and 10% as debris. Fresh brick and brick bat shall be issued to contractor / firm at prevailing/pertaining SOR.
9.The amount of scrape steel recoverd from dismantling shall be issued to contractor / firm at 1/3rd of rate in prevailing/pertaining SOR .
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2010006.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .