Tender Value
₹15.3 Cr
EMD Value
₹15.3 L
Closing Date
20 Jul 2026, 5:00 pm
Additional Chief Enginner, OTDC Ltd.
O/o The Additional Chief Enginner, OTDC Ltd., BBSR
Infrastructure Development of Pakhnapat Temple of Jamda Block in Mayurbhanj District
2026_OTDC_134529_1
ACE/OTDC/01/2026-27
National Competitive Bid
Civil Works - Buildings
540 days
Pakhnapat Temple, Jamda Block
AS PER DTCN
3 documents required · 3 mandatory
₹10,000
₹15.3 L
Yes
6 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning & grubbing road land including uprooting rank vegetation ,grass bushes ,shrubs,saplings & trees girth up to 300mm ,removal of stumps of trees cut earlier & disposal of unserviceable material & &stacking of serviceable material to be used or auctioned ,up to a lead of 1000meters including removal & disposal of top organic soil not exceeding 150mm in thickness comleted. | 30,173.98 | SQM | 8.15 | ₹2,45,917.94 |
| 2 | Earthwork in excavation of foundation trenches in ordinary soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. | 15,867.58 | CuM | 210.52 | ₹33,40,442.94 |
| 3 | extra for every additional lift of 1.5 m or part there of in excavation/ banking excavated or stacked materials | 223.3 | CuM | 233 | ₹52,028.9 |
| 4 | Supplying and filling in foundation trenches and plinth, ditches with sand well-watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | 4,655.99 | CuM | 545.22 | ₹25,38,538.87 |
| 5 | Filling at all depth with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 15cm in depth: consolidating each deposited layer byramming and watering complete (lead upto 100m) as directed by the Engineer-In-charge. | 3,358.84 | CuM | 116.96 | ₹3,92,849.93 |
| 6 | Providing and lying plain cement concrete of proportion (1:3:6) in Floor or similar location using Portland Slag Cement(PSC) with 4 cm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties, cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per specification and direction of Engineer-in-charge. | 413.65 | SqM | 5,944.11 | ₹24,58,781.1 |
| 7 | With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 1,030.21 | SqM | 104.5 | ₹1,07,656.95 |
| 8 | Providing and laying P.C.C[1:4:8] using 4cm size metal etc in foundation and floors using cement , 40 mm size crusher broken H.G.Metal and screened and washed sharp river sand for mortar of approved quality and from approved quarry including hoisting ,lowering and laying concrete to the required level, ramming ,watering and curing etc | 440.09 | CuM | 5,549.22 | ₹24,42,156.23 |
| 9 | Providing and laying in position ready mixed M25 grade concrete having compressive strength at 28 days test not lessthan 250kg/sq.cm for reinforced cement concrete work using cement content as per approved design mix etc including Rigid & smooth centering and shuttering. | - | - | - | - |
| 10 | For R.C.C foundation, footing bases of column, mass concrete,pre-cast etc. | 1,121.74 | CuM | 6,805.38 | ₹76,33,866.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
DTCN.pdf
Tender Documents • 19.47 MB
BOQ_599845.xls
BOQ • 0.72 MB
Download all tender documents and submit your bid