Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | +0.00% | ₹3.9 L | L1 | Admitted-Finance |
| 2 | L2₹4.1 LAdmitted-Finance | +3.91% | ₹4.1 L | L2 | Admitted-Finance |
| 3 | L3₹4.1 LAdmitted-Finance | +4.99% | ₹4.1 L | L3 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹8,000
Closing Date
18 Feb 2026, 12:00 pmClosed
E.E (C)/BR-XVI
4, DIAMOND PARK, KOLKATA-700104
MAINT. OF SURFACE DRAIN AT R.N TAGORE BYE LANE ROAD AND BANKIM PARK ROAD SLUM AREA NEAR PRE. NO-135/9A AND 511 IN WARD NO-124.
2026_KMC_1003059_1
KMC/E.E.(C)/BR-XVI/124/045 /25-26/UTTARAN
Open Tender
CIVIL WORKS
30 days
WARD-124
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹8,000
3 Mar 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(iii) 35 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A).
Sub Total
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_2458600.xls
BOQ • 0.23 MB
TENDER_FORM.pdf
Tender Documents • 0.56 MB
CIVIL_new.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid