Tender Value
₹24.4 L
EMD Value
₹24,420
Closing Date
26 Sept 2026, 2:00 pm3d left
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2026_PVVNV_1185088_1
20/SE/EUDC-I-Pra/MM/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
Magh Mela Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Account Number-0012002100504911
₹24,420
12 Sept 2026
12 Sept 2026
28 Sept 2026
12 Sept 2026
26 Sept 2026
12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Temporary L.T. line, Installation of Street Light and other Miscellaneous works in Sangam Area North of Jagdish Ramp To Shivala marg Mela West of ganga river , during Magh Mela 2026-27 which includes loading, unloading and carriage of all required materials from Mela Store to Site and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. (MS Nut & Bolts with washer for all related works will be provided by contractor on rental basis). | |||||
| 1.01 | Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. Long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on Road crossing, ghats and 4 No. latching per span in other area) & earthing of every Fifth poles. | 12 | Ckt. Km. | - | - |
| 1.02 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock for complete Mela period | 8 | Ckt. Km. | - | - |
| 1.03 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock form 01.12.2026 to 30.06.2027 | 4 | Ckt. Km. | - | - |
| 1.04 | Dismantling of L.T. line single phase, 4 wire after completion of Mela period. | 12 | Ckt. Km. | - | - |
| 1.05 | Construction of L.T. line Three phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on Road crossing, Ghats and 4 nos latching per span in other area) & earthing of every Fifth poles. | 8 | Ckt. Km. | - | - |
| 1.06 | Maintenance of L.T. Line Three phase 6 wire by providing maintenance gang round the clock for complete Mela period | 4 | Ckt. Km. | - | - |
| 1.07 | Maintenance of L.T. Line three phase, 6 wire by providing maintenance gang round the clock form 01.12.2025 to 30.06.2026. | 3 | Ckt. Km. | - | - |
| 1.08 | Dismantling of L.T. line Three phase 6 wire after completion of Mela period. | 8 | Ckt. Km. | - | - |
| 2Testing, Checking & Installation of LED Street Light Fittings including Maintenance by Mounting & fixing of street light bracket with clamps and LED street light fitting, on erected S.T.P. in proper position and making electrical connection. which includes loading, unloading and carriage of all required materials from Mela Store to Mela Area and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_2229928.xls
BOQ • 0.29 MB
T-No-20 LT Sanagam Lower Jagdis Ramp to North.docx
Tender Documents • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .