TENDER FOR CARRYING OUT HOT REPAIR OF 5KG, 14.2KG, 19KG, 35KG AND 47.5KG LPG
21000818-HD-10157
21000818-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
17 Jan 2022
28 Dec 2021
17 Jan 2022
17 Jan 2022
28 Dec 2021 - 4 Jan 2022
4 Jan 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | HOT REPAIR 47.5KG | HOT REPAIR 47.5KG — VISUAL INSPECTION AS PER IS-13258:1991 (LATEST), DEGASSING OF CYLINDERS BY FILLING WITH WATER, DE-DENTING OF CYLINDERS, REPLACEMENT OF FOOT RING AND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING, SHOT BLASTING, METALLIZING, PAINTING, STENCILING, FIXING OF VALVE, PNEUMATIC TESTING ETC. COMPLETE HOT REPAIR OF CYLINDERS INCLUDING LOADING/UNLOADING AND TO AND FRO TRANSPORTATION CHARGES BETWEEN PLANT AND REPAIRERS UNIT. JOB INCLUDES CUTTING AND REMOVING FOOT RING AND VP RINGS, AND WELDING NEW FOOT RING AND VP RING, AS PER SPECIFICATION. THE RATE TO EXCLUDE SUPPLY OF CONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIRE FOR METALIZING, PRIMER, PAINT (FOR CYLINDER AND STENCILING) AND TEFLON TAPE FOR VALVE FIXING. | - | Each |
| 2 | HOT REPAIR 5KG | HOT REPAIR 5KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 5 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC. RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE TO BE QUOTED AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. THERE WILL NOT BE ANY PAYMENT AGAINST REJECTED HR CYLINDERS QUANTITY . | - | Each |
| 3 | HOT REPAIR 35KG | HOT REPAIR 35KG — VISUAL INSPECTION AS PER IS-13258:1991 (LATEST), DEGASSING OF CYLINDERS BY FILLING WITH WATER, DE-DENTING OF CYLINDERS, REPLACEMENT OF FOOT RING AND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING, SHOT BLASTING, METALLIZING, PAINTING, STENCILING, FIXING OF VALVE, PNEUMATIC TESTING ETC. COMPLETE HOT REPAIR OF CYLINDERS INCLUDING LOADING/UNLOADING AND TO AND FRO TRANSPORTATION CHARGES BETWEEN PLANT AND REPAIRERS UNIT. JOB INCLUDES CUTTING AND REMOVING FOOT RING AND VP RINGS, AND WELDING NEW FOOT RING AND VP RING, AS PER SPECIFICATION. THE RATE TO EXCLUDE SUPPLY OF CONSUMABLES VIZ., WELDING ELECTRODES , ZINC WIRE FOR METALIZING, PRIMER, PAINT (FOR CYLINDER AND STENCILING) AND TEFLON TAPE FOR VALVE FIXING. | - | Each |
| 4 | HOT REPAIR 14.2KG | HOT REPAIR 14.2KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 5 | HOT REPAIR 19KG | HOT REPAIR 19KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 6 | HOT REPAIR 14.2KG | HOT REPAIR 14.2KG — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 7 | HOT REPAIR 19KG | HOT REPAIR 19KG — VISUAL INSPECTION AS PER IS-13258:1991 (LATEST), DEGASSING OF CYLINDERS BY FILLING WITH WATER, DE-DENTING OF CYLINDERS, REPLACEMENT OF FOOT RING AND VP RING, HEAT TREATMENT, HYDROSTATIC TESTING, SHOT BLASTING, METALLIZING, PAINTING, STENCILING, FIXING OF VALVE, PNEUMATIC TESTING ETC. COMPLETE HOT REPAIR OF CYLINDERS INCLUDING CUTTING AND REMOVING FOOT RING AND VP RINGS, AND WELDING NEW FOOT RING AND VP RING, AS PER SPECIFICATION. | - | Each |
| 8 | HOT REPAIR 14.2KG JIND | HOT REPAIR 14.2KG JIND — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 14.2 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
| 9 | HOT REPAIR 19KG JIND | HOT REPAIR 19KG JIND — JOB INCLUDES SEGREGATION, VISUAL INSPECTION AS PER IS 13258:1991(LATEST) OF HR 19 KG CYLINDER, NOTING DETAILS LIKE SERIAL NUMBER OF CYLINDER, MANUFACTURER'S NAME, YEAR OF MANUFACTURING ETC., OF GENUINE HR CYLINDER IN A STANDARD FORMAT, DEGASSING OF CYLINDER, EXTERNAL/INTERNAL CLEANING, CUTTING AND REMOVING OF VP RINGS WITH STAY PLATES AND FOOT RING AND WELDING OF NEW VP RING WITH STAY PLATES AND FOOT RING AS PER SPECIFICATION, HEAT TREATMENT, HYDRO TESTING, SHOT BLASTING, METALIZING, CIRCUMFERENTIAL WELD REPAIR, PAINTING, VALVE FIXING, PNEUMATIC TESTING, MARKING, STENCILING OF TARE WEIGHT, LOGO, SAFETY MESSAGE ETC, LOADING/UNLOADING AND TO AND FRO TRANSPORTATION BETWEEN PLANT AND REPAIRERS' UNIT, PREPARATION OF LIST OF REJECTED CYLINDER GIVING DETAILS SUCH AS MANUFACTURER'S NAME, YEAR OF MANUFACTURE, REASON FOR REJECTION ETC.RECONDITIONED TO CONFORM TO IS 13258- 1991(LATEST).THE COST OF ITEM INCLUDES ALL EXPENSES TOWARDS STATIONERY, LABOUR, CYLINDER HANDLING AND LOADING CHARGES IN A VERTICAL STACKING ETC,COST OF NEW VP RINGS WITH STAY PLATES AND NEW FOOT RINGS, ALL THE MATERIALS, CONSUMABLES, TOOLS AND TACKLES TO BE BORNE BY THE PARTY TO CARRY OUT ABOVE MENTIONED JOB,TWO WAY TRANSPORTATION OF CYLINDER FROM PLANT TO REPAIRERS PREMISES AND BACK TO THE PLANT FOR HOT REPAIRED CYLINDERS AND REJECTED CYLINDER ALONG WITH THE VP RING STAY PLATE AND FOOT RING.THE RATE MENTIONED IN THE PRICE BAND IS AFTER CONSIDERATION OF SCRAP VALUE OF THE OLD VP RING WITH STAY PLATES AND THE OLD FOOT RINGS WHICH ARE TO BE DISPOSED OFF BY THE PARTY.PAYENT WILL BE MADE FOR ACTUAL HOT REPAIRED CYLINDERS. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000818-HD-10157.pdf
TENDER_DOCUMENT • 12.45 MB
Download all tender documents and submit your bid