Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC Low Price | |
| 2 | L2₹7.9 L+₹141.69 (0.02%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Subashchandhraboss L1 | AK. MUTHUMANICKAM L2 |
|---|---|---|---|---|---|
| 1.00Construction of Kalaiyarangam at Edaiyathimangalam near Karuppankovil in Edaiyathimangalam Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete. | 21.27 | Cum | 246.5 ₹5,243.06 Lowest | 246.52 ₹5,243.48 |
| 3.00 | Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick wekk cammed watered and compacted., complete complying to standard specification. | 7.71 | Cum | 2,084.7 ₹16,073.04 Lowest | 2,084.79 ₹16,073.73 |
| 4.00 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement. | 6.53 | Cum | 42.8 ₹279.48 Lowest | 42.85 ₹279.81 |
| 5.00 | Cement Concrete 1:4:8mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 6.12 | Cum | 5,829.1 ₹35,674.09 Lowest | 5,829.19 ₹35,674.64 |
| 6.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 96 | Sqm | 1,032 ₹99,072 Lowest | 1,033 ₹99,168 |
| 7.00 | Cost and supply of steel with fabrication charges including cost of steel and binding wire complete with standard specification etc., complete | 1.56 | Mt | 91,927.5 ₹1,43,406.9 Lowest | 91,927.7 ₹1,43,407.21 |
| 8.00 | R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 17.15 | Cum | 9,520 ₹1,63,268 Lowest | 9,520.1 ₹1,63,269.72 |
| 9.00 | Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete. | 15.29 | Cum | 6,096.4 ₹93,213.96 Lowest | 6,096.42 ₹93,214.26 |
| 10.00 | Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work,(Based on SoR 2023 - 24) | 65.45 | Sqm | 273 ₹17,867.85 Lowest | 273.05 ₹17,871.12 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
11 Sept 2025, 3:00 pmClosed
BDO
PT UNION OFFICE
Construction of Kalaiyarangam at Edaiyathimangalam near Karuppankovil in Edaiyathimangalam Panchayat
2025_RDTN_600431_1
MLACDS Work In Construction of Kalaiyarangam in Edaiyathimangalam Pt
Open Tender
Civil Works - Buildings
Works
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
Yes
23 Sept 2025
5 Sept 2025
11 Sept 2025
5 Sept 2025
11 Sept 2025
5 Sept 2025
Amount
Construction of Kalaiyarangam at Edaiyathimangalam near Karuppankovil in Edaiyathimangalam Panchayat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soils such as as per S.S.20B for narrow foundation etc. complete.
Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick wekk cammed watered and compacted., complete complying to standard specification.
Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement.
Cement Concrete 1:4:8mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cost and supply of steel with fabrication charges including cost of steel and binding wire complete with standard specification etc., complete
R.C.C. 1:1 1/2:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Brick work with Cement Mortar 1:5 Mix using Country Bricks including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and applying of two Coats of Putty of 3mm thick over the exposed Rcc surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.The Surface shall be then be allowed to dry for atleast 48 hours.It Shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface.Any unevenness Shall be made good by applying 1st Coat of Putty mixed with water on the entire surface including filling up the undulations and applying 2nd Coat of putty after 6 hours of 1st Coat of putty and then sand preparing (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly,etc,Complete complying with standard specification and as directed by the Departmental officers.[the rates are inclusive of the charges for grinding machine with wheel.cost of sand paper (water proof abrasive sheet),cost of putty , blade, labour charges for grinding the joints and sand papering,two coat of putty Scrapping the putty area to level the surface smooth,etc.,complete].The Putty should be got approved by the Executive engineerbefore use on work,(Based on SoR 2023 - 24)
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete
Providing Granolithic Pattern Floor finish with plain cement concrete 1:2:4 using 10-12 mm ISS HBG metal and top rubbed smooth etc., complete complying with standard specification as directed.
Cost and Supply of Steel Door including cost and conveyance of all materials to site and all labour charges etc
Emulsion Painting two coats with Exterior emulsion over one coat of primary coat including cleaning preparing the surface
Painting with two coats of new iron work including cost and conveyance of all labour charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
AK. MUTHUMANICKAM (BID ID -1454860)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .