Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
21 Feb 2023, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Town TANGEDCO
EE Town TANGEDCO
Town Division Central Upgraded Section Work Contract
2023_EB_288362_1
EE/Town/WC.007/2022-23
Open Tender
Electrical Works
Works
180 days
Central
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
24 Feb 2023
13 Feb 2023
22 Feb 2023
13 Feb 2023
21 Feb 2023
14 Feb 2023
Amount
Supply of Materials
33KV 3*400 Sqmm HT Cable Staight Joint Kit
GI Pipe 160mm dia (6mts Length)
Labour Charges
Excavation of pole pit upto 27"(8.0 m) Poleby using JCB/ Manual
Excavation of Stay pit 4.5' to 5' depth by using JCB/ Manual
Excavation of pole pit upto 9.14/9.00 Mtr Pole by using JCB/ Manual
Erection of PSC/RCC Poles/Metal Poles upto 8.00m.(27')by using crane/Manual
Erection of PSC/RCC Poles/Metal Poles Above 8.00m by using crane/Manual
Dismantling of Metal Supports above 9.00m/RSJ/Rail Pole/Febricated Poles/Tubula Pole by using crane / Manual
Dismantling of PSC/RCC Poles/Metal Poles upto 8.00mts
Dismantling of PSC/RCC Poles/Metal Poles Above 8.00mts
Erection of stay set complete
Dismantling of stay set complete
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Erection of HT Tapping cross arms (all types)/ channel cross arms/guarding Cross arms 3 1/2
Erection of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 4 1/2
Dismantling of HT "V" cross arms (all types)/ channel cross arms/guarding Cross arms 4 1/2
Erection of LT 3 phase cross arms angle and channel
Dismantling of LT 3 phase cross arms angle and channel
Erection of LT Single phase cross arms angle and channel
Dismantling of LT Single phase cross arms angle and channel
Erection of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of HT pin Insulators(22KV)
Dismantling of HT pin Insulators(22KV)
Fixing of HT 22 KV Strain Disc.
Dismantling of HT 22 KV Strain Disc
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT Shackle
Dismantling of LT Shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Earthing of pole with pit including burying looping and binding.
Paving of Conductor, stringing, binding Jumpering etc., complete with ACSR for both HT/LT lines - ACSR 7/3.35 mm / AAAC 7/3.15 mm
Dismantling of HT/LT Lines -- ACSR 7/3.35 mm / AAAC 7/3.15 mm
Paving of Conductor & LT UG Cable- stringing, binding Jumpering etc., complete with 2x16 Sqmm,4x24 Sqmm, ACSR for both HT/LT lines - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
Dismantling of HT/LT Lines - - ACSR 7/2.59 mm , ACSR 7/2.11 mm , AAAC 7/2.50 mm
Numbering of pole and with base painting.
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle( Except erection of transformer)
Dismantling of Transformer Structure
HT Guarding
Transport of Materials/ conductors and other materials (excluding loading and unloading charges.) - Upto 8 Kms.
Loading of poles upto 27'-0"
Unloading of polesupto 27'-0"
Loading of poles upto 30"
Unloading of poles upto 30"
Loading of materials
Unloading of materials
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual upto 100m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or Manual beyond 100m
Loading / unloading of Transformer upto 200KVA
Erection of New Transformer all Capacities
Erection of single pole structure
Loading / Unloading of HT Metering set (New)
Erection of HT Metering set
Releasing of single phase service and refixing
Releasing of Three phase service and (upto 50 KW)refixing
Erection of D.P. Structure with AB switch, top channel, cross bracing, Earthing painting, providing stay and pole concreting.
Dismantling od D.P Structure
Drilling of hole in channel only 3/4" & 1" per hole
Mass concreting for poles including cost of materials and labour 5'x2'x2'
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
UG Loading, unloading ,transporting and erection of RCC Cable marker of standard size including painting the word " TNEB/ UG CABLE" and other notations as per the site Engineers instruction. (Includes excavation and laying)
HT UG - Earthwork excavation 1.2 Mt.average Depth X 0.6mt average width in hard stiff clay, shales murran gravel, stoney earth and mixed with small sizes boulders and gravelly soil r for sand bedding as directed by the Engineer-in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, lead and lift etc., complete excluding blacktopping and including trial pits charges
HT UG - Labour charges for removing of black topping portion of 0.6mt average width by using chisel, hammer and pick axe and including cost of signal board and danger light and providing watch and ward staff to prevent any accident caused to the cattle and human beings including sharpening charges of chisel and including excaavation of road cutting using JCB/Air compressor Drill at Day and Night time and avoiding any damage to the telecom and water lines etc (Along the Road) including trial pits
HT UG - Providing sand bedding with good quality of river sand to a depth of 6" in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
HT UG - Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor. - Dept Vehicle
HT UG - Recoiling / Laying / Removal of HT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitabl endsand which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading of tools and plant etc.,the contractor must bring all tools and plants.
HT UG - Drawal/Laying of R.C.C."V" Troughs in th excavated cable trench from Stores/ Worksite including transportation without any damage .This includes all Lead ,Lift safe unloading, safe Loading and transport etc. ( Note: Damage if any due to rough handling, the cost of V trough will be be deducted)
HT UG - Excavation of pit (for providing Straight joint) of size 3.6 M X 2.4 M X 1.3 M and excavation of cable trench for 3 M on either side of the joint location for releasing the cable.This includes labour for providing and releasing of tent at joint location, transporting of tent from office to site and back, removing and refixing of "V" troughs, fixing the joint works &carefully fixing the joint in position after completing of jointing and refilling the trench with the excavated soil.
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Outdoor End termination Kit-Heat shrinkable type,including charges for cable jointer.
HT UG - Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
Labour for loading unloading of iron scrapin lorry/drum for devolution(The Scap may be Devoluted by the department lorry)
Dismantling of HT HG Cable
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .