Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 2 | Not Admitted-PreQual/Technical | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.1 Cr
EMD Value
₹6.1 L
Closing Date
21 Sept 2022, 5:30 pmClosed
Chief Engineer PWD Central Zone Jabalpur
O/o The Chief Engineer PWD Central Zone Jabalpur
Construction of Naheriya Main Road to Urdhandhana Road length 2.54 Km and Parasiya Main Road to Harraidhana Road length 3.00 Km. Total Length 5.54 Km. Including Electric Pole Shifting and Height Extension work. (1st Call)
2022_PWDRB_220092_1
09/GEN/2022-23
Open Tender
Civil Works - Roads
Percentage
420 days
Work
Please refer Tender documents.
4 documents required · 4 mandatory
₹20,000
₹6.1 L
7 Mar 2023
8 Sept 2022
23 Sept 2022
8 Sept 2022
21 Sept 2022
8 Sept 2022
stage.html
html • 0.02 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.64 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tenderdocument.pdf
Tender Documents • 6.74 MB
NitSchedule.pdf
Tender Documents • 11.16 MB
BOQ_258769.xls
BOQ • 0.25 MB
additionalcondition.pdf
Additional Documents • 3.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .