| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 CrAdmitted-Finance | ₹15.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.9 Cr+₹6.7 L (0.43%)Admitted-Finance | ₹15.9 Cr+₹6.7 L (0.43%) | L2 | Admitted-Finance |
| 3 | L3₹15.9 Cr+₹8.4 L (0.53%)Admitted-Finance | ₹15.9 Cr+₹8.4 L (0.53%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S HIM ENTERPRISES L1 | M/S ZEMINI ENTERPRISES L2 | M/S G B ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | (SH:- Formation Cutting) Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 Metres) | 75,090.88 | cum | 263 ₹1,97,48,901.44 Lowest | 263 ₹1,97,48,901.44 Lowest | 263 ₹1,97,48,901.44 Lowest |
| 2.00 | Depositing of excavated earth on the barren valley side. (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the Barren Valley side) | 37,545.44 | cum | 134 ₹-50,31,088.96 Lowest | 134 ₹-50,31,088.96 Lowest | 134 ₹-50,31,088.96 Lowest |
| 3.00 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres) | 18,772.72 | cum | 384 ₹72,08,724.48 Lowest | 384 ₹72,08,724.48 Lowest | 384 ₹72,08,724.48 Lowest |
| 4.00 | Disposal of excavated earth on the barren valley side. (Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side) | 9,386.36 | cum | 213 ₹-19,99,294.68 Lowest | 213 ₹-19,99,294.68 Lowest | 213 ₹-19,99,294.68 Lowest |
| 5.00 | (SH: PAVEMENET) Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.) | 34,104 | Sqm | 167 ₹56,95,368 Lowest | 169 ₹57,63,576 | 169 ₹57,63,576 |
| 6.00 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 34,104 | Sqm | 8 ₹2,72,832 Lowest | 8 ₹2,72,832 Lowest | 8 ₹2,72,832 Lowest |
| 7.00 | Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (i) for grading- I Material | 5,115.6 | cum | 2,413 ₹1,23,43,942.8 Lowest | 2,433 ₹1,24,46,254.8 | 2,433 ₹1,24,46,254.8 |
| 8.00 | WET MIX MACADAM-(WMM) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Using 45 mm to 22.4 mm@ 30 per cent, 22.4 mm to 2.36 mm @ 40 per cent, 2.36 mm to 75 micron@ 30 per cent) | 4,851 | cum | 2,660 ₹1,29,03,660 Lowest | 2,681 ₹1,30,05,531 | 2,681 ₹1,30,05,531 |
| 9.00 | DENSE BITUMINOUS MACADAM Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. | 32,340 | Sqm | 64 ₹20,69,760 Lowest | 65 ₹21,02,100 | 65 ₹21,02,100 |
| 10.00 | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) for Grading-I(40mm nominal size) | 1,617 | cum | 17,379 ₹2,81,01,843 Lowest | 17,519 ₹2,83,28,223 | 17,519 ₹2,83,28,223 |
Tender Value
Refer Docs
EMD Value
₹15.9 L
Closing Date
16 Mar 2025, 4:00 pmClosed
Executive Engineer Pakke Kessang Division PWD
Executive Engineer, Pakke Kessang Division, PWD, AP, Pakke Kessang
C/o Township roads District Headquarter at Lemmi under (CMCSRDP-II)
2025_PWDAP_2171_1
PKD/PKSD/NIT/CMCSRDP/2024-25/1
Open Tender
Civil Works – Roads
Item Rate
Pakke Kessang
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
EE PWD Pakke Kessang
₹15.9 L
Pakke Kessang
18 Oct 2025
3 Mar 2025
17 Mar 2025
3 Mar 2025
16 Mar 2025
3 Mar 2025
10 Mar 2025
stage.html
html • 0.03 MB
technical_2332.pdf
techsummary_2332.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
SBD_Lemmi.pdf
Tender Documents • 13.00 MB
BOQ_2332.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .